100th St Bascule Bridge Over the Calumet River Rehabilitation
City of Chicago — CHICAGO DEPARTMENT OF TRANSPORTATIONChicago, Cook, Illinois#1337508
The City of Chicago, via the Chicago Department of Transportation, is seeking bids for the rehabilitation of the 100th Street Bascule Bridge over the Calumet River. The work includes structural repairs, mechanical system upgrades, deck resurfacing, and component replacement. Bidders must attend a mandatory pre-bid conference and on-site visit on October 1, 2026, at 10:00 a.m. Central Time, at CDOT offices, followed by a site visit at 11:45 a.m. at the bridge site. Bid questions are due by October 14, 2026.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 20, 2026, 11:00 AM CT
- Time stated in bid documents
- Nov 20, 2026, 11:00 AM Central Time
- Submission
- mail, hand delivery
Scope of work
- Resurface bridge deck with SP-9.5 asphalt
- Replace deteriorated steel and concrete elements
- Upgrade navigation and safety systems
- Conduct on-site inspection and site visit
Steps to Bid
- 1
Submit any questions to the buyer by October 14, 2026. was Oct 14, 2026
This date has passed — confirm eligibility with the agency before bidding.
- 2
Attend the mandatory pre-bid conference and on-site visit on October 1, 2026, at 10:00 a.m. Central Time at CDOT In-House Construction Offices, 900 E. 103rd Street, Chicago, IL 60628. was Oct 1, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit the complete bid response by November 20, 2026, at 11:00 a.m. Central Time. by Nov 20, 2026, 11:00 AM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130, 237199
How to submit
Bids must be submitted in a sealed envelope marked '100th St Bascule Bridge Rehabilitation – Bid #1337508' and delivered to the Chicago Department of Transportation, 900 E. 103rd Street, Chicago, IL 60628, by 11:00 a.m. Central Time on November 20, 2026. Late submissions will not be accepted.
In person/mail: 900 E. 103rd Street, Chicago, IL 60628
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes structural repairs, mechanical system overhaul, deck resurfacing, and replacement of deteriorated components to ensure safe and reliable operation. Work will be performed at the bridge site located at 3257 E 100th St, Chicago, IL 60617. The project is classified as Large Construction. Bidders must attend the pre-bid conference and on-site visit on October 1, 2026, at 10:00 a.m. Central Time, at CDOT In-House Construction Offices, 900 E. 103rd Street, Chicago, IL 60628, followed by a site visit at 11:45 a.m. at the West Bridge House. Pre-registration is required by 2:00 p.m. Questions must be submitted by October 14, 2026. The solicitation is active and open to qualified bidders. No set-aside or small business preference is indicated.
Key dates
- Questions due
- Oct 14, 2026
- Pre-bid meeting
- Oct 1, 2026, 10:00 AM Central Time
- Site visit
- Oct 1, 2026, 11:45 AM Central Time
- Bids due
- Nov 20, 2026, 11:00 AM CT
More from this agency
- Lignite Coal Based Powdered Activated Carbon — closes Nov 20, 2026
- Vehicle Safety Inspection Testing Services — closes Nov 20, 2026
- Window Mounted and Portable Air Conditioners (Target Market) — closes Nov 23, 2026
- Comprehensive Conveyance Maintenance & Repair Services at O'Hare International Airport — closes Nov 24, 2026
- Residential Sound Insulation Program Odor Mitigation Phase 2 – Chicago Midway and O’Hare International Airports — closes Nov 24, 2026
Similar open bids
- Roadway & Bridge Rehabilitation & Plaza Improvements — Illinois State Toll Highway Authority
- Jane Addams Memorial Tollway (I-90) Roadway and Bridge Rehabilitation and Plaza Improvements — THA - Toll Highway Authority
- Roadway & Bridge Rehabilitation & Plaza Improvements — Illinois State Toll Highway Authority
- Bridge Rehabilitation and Plaza Improvements, Rockton Road to Rock Cut Park Road, MP 2.6–10.3, Jane Addams Memorial… — THA - Toll Highway Authority
- Harrison Ave Bridge Rehabilitation — Rebid — City of Rockford
Closing this week nearby
- Tender Chassis Procurement — closes Nov 20, 2026
- Hamilton School District 328: E-Rate FY2027 Category 2 - Cabling — closes Nov 19, 2026
- E-Rate FY2027 Category 2: Network Switches, Software, Licenses, and Wireless Access Points — closes Nov 19, 2026
- Foliar Treatment of Non-Native and Invasive Shrubs on Midewin National Forest — BPA Call Order — closes Nov 19, 2026
- Executive Search Firm for Vice President of Academic Affairs and Three Dean Positions — closes Nov 19, 2026