OpenRFICloses Feb 2, 2027

Repair and Modification of Cover, Access, Aircra (NSN: 74A140111-2010, P/N: 1560 016860091)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTNationwide (Federal)#N0038326QLA97

The U.S. Navy is soliciting bids for the repair, testing, and inspection of a specific aircraft component (COVER, ACCESS, AIRCRA, NSN: 74A140111-2010, P/N: 1560 016860091) to return it to a Ready for Issue (RFI) condition. The work must be performed at the contractor’s facility using approved repair manuals and OEM technical drawings. The contractor is responsible for all tools, test equipment, and manufacturing aids. Repair Turnaround Time is 90 days from asset receipt. The contractor must report asset receipt in the CAV system within five business days. No Government Furnished Property is provided. MIL-W-81381 wire is prohibited; SAE-AS22759 wire must be used. Changes to repair processes or facilities require prior written approval from the Procuring Contracting Officer. BER items (repair cost >75% of replacement cost) are excluded and require DCMA concurrence. All documents are considered issued upon electronic or postal transmission.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Feb 2, 2027
Time stated in bid documents
Feb 2, 2027, 8:30 PM
Submission
email

Steps to Bid

  1. 1

    Review the solicitation and all referenced documents, including the Statement of Work, technical drawings, and repair manuals.

  2. 2

    Submit questions to the contact listed before the due date. by Feb 2, 2027, 2:30 PM

  3. 3

    Prepare and submit a complete proposal in accordance with the instructions. by Feb 2, 2027, 2:30 PM

What you'll need

Submission

Email

How to submit

Proposals must be submitted via email to [email available with Pro]. No hard copies or physical delivery are accepted. Submissions must be received by the due date and time.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contractor must perform all repairs, upgrades, reassembly, and testing at their facility in accordance with approved repair/overhaul manuals and OEM technical drawings. Prohibited materials include MIL-W-81381 wire; SAE-AS22759 series wire must be used instead. The contractor is responsible for all tools, test equipment, jigs, dies, and other manufacturing aids required for repair. The contractor must report all asset receipts in the Commercial Asset Visibility (CAV) system by the end of the fifth business day after receipt. Induction Expiration Date is 365 days after contract award; assets received after this date are not authorized for repair without bilateral agreement. Unapproved changes are at the contractor’s risk. The contractor must maintain process control documentation, including sequential repair procedures and test specifications, for Government review. Items determined to be Beyond Economical Repair (BER) — where repair cost exceeds 75% of the current production replacement price — are excluded from the contract. The contractor must obtain written concurrence from DCMA for all BER determinations and submit the basis, repair plan, and cost to the PCO and inventory manager. All contractual documents are deemed issued when transmitted via email, facsimile, or postal mail. The Government’s acceptance of the proposal constitutes bilateral agreement to issue such documents.

Key dates

Questions due
Feb 2, 2027, 8:30 PM
Bids due
Feb 2, 2027

More from this agency

Similar bids nearby

Closing soon nearby