OpenRFPCloses Dec 16, 2026

Repair and Overhaul of Aircraft Component (NSN 7RH 1680 015855026 / Part Number 645602-1-1)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038325QH158

The U.S. Work must follow Honeywell drawing 70210, revision latest, and MIL-STD-130 for markings. The contractor is responsible for all tools, jigs, and test equipment. The repair process includes disassembly, inspection, component replacement, reassembly, and testing to RFI condition. The RTAT is 13 days from physical receipt at the contractor’s facility. Failure to meet RTAT results in a price reduction of TBD per unit. Early deliveries are preferred. The solicitation is not set aside for small businesses. Bids must be received by 16 December 2026 at 15:30 ET.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 3:30 PM Eastern Time
Submission
electronic portal
Required submission items
1 items · full checklist with Pro

Scope of work

  • Repair and overhaul of aircraft component (NSN 7RH 1680 015855026 / Part Number 645602-1-1)
  • 13-day Repair Turnaround Time (RTAT) from physical receipt

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation and all attached clauses, including FAR 52.212-4 and the amendment.

What you'll need

Submission

Electronic portal

NAICS

336413

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work must be performed in accordance with Honeywell International drawing number 70210, revision latest, and all referenced specifications. All fixtures, jigs, dies, patterns, special tooling, test equipment, and other manufacturing aids are the sole responsibility of the contractor and will not be provided by the Government. The Repair Turnaround Time (RTAT) is 13 days from physical receipt at the contractor’s facility, as reflected in the Commercial Asset Visibility (CAV) system. The contractor must report all transactions by the end of the fifth regular business day after receipt. Early and incremental deliveries are accepted and preferred. The requirement is not a Small Business Set-Aside. The solicitation is issued under FAR 52.212-4 for commercial items. The Government will issue contractual documents via mail, facsimile, or electronic means. Acceptance of the proposal constitutes bilateral agreement to issue such documents.

Key dates

Bids due
Dec 16, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania