OpenRFPCloses Dec 3, 2026

Repair and Overhaul of Heat Exchanger, Fluid (NSN: 70207-000-1; P/N: 1660-01-454-5010)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORTPennsylvania#N0038324QB194

The U.S. Navy is soliciting quotes for the repair and overhaul of a fluid heat exchanger (NSN: 70207-000-1; P/N: 1660-01-454-5010). The contractor is responsible for all tools, test equipment, and materials. MIL-W-81381 wire is prohibited; SAE-AS22759 wire must be used. The Requested RTAT is 45 days. The repair must be performed at the facility specified in the Statement of Work. Changes to repair procedures or facilities require prior written approval from the Procuring Contracting Officer. The Government will not provide any repair tools, jigs, dies, or test equipment.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 3:30 PM Eastern Time
Submission
electronic portal

Scope of work

  • Return to Ready for Issue (RFI) condition
  • DCMA concurrence required for BER items

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation and all referenced documents (e.g., SOW, technical publications in JEDMICS).

  3. 3

    Submit questions to the Procuring Contracting Officer by the deadline (if any).

What you'll need

Submission

Electronic portal

NAICS

336413

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Government will not provide fixtures, jigs, dies, patterns, special tooling, test equipment, or any other manufacturing aid. The use of MIL-W-81381 wire is prohibited; SAE-AS22759 series wire must be used in its place. If MIL-STD-454 is referenced, compliance with IPC/EIAJ-STD-001C is required, and personnel must be trained and certified accordingly. The Government's acceptance of the proposal constitutes bilateral agreement to issue the contract. Any changes to repair manuals, drawings, specifications, repair source, or facility require prior written approval from the Procuring Contracting Officer (PCO). Unapproved changes are at the contractor’s risk. The contractor must maintain and provide process control documentation, including sequential repair diagrams and test/inspection procedures, for Government review and approval. The contractor must also provide written disposition instructions and DCMA concurrence for any BER items before proceeding with repair. The contractor is not entitled to an equitable adjustment if the Government disapproves a change request. All references to the 'prime contractor' or 'actual manufacturer' on drawings or specifications are to be interpreted as the 'Government Designated Agency'.

Key dates

Bids due
Dec 3, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania