2025/2026 Arterial and Minor Streets Maintenance, Phase 1 & 2
City of Riverside — Public WorksRiverside, California#8242
The City of Riverside is soliciting bids for maintenance and improvement of arterial and minor streets across the city. Scope includes cold milling, asphalt resurfacing with DGAC, slurry sealing, sidewalk and curb repairs, landscaping, irrigation, gravel trench installation, traffic striping and signage replacement, and excavation and reuse of asphalt millings. The estimated value is $8,675,115.00. A bid bond is required.
On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 16, 2026
- Time stated in bid documents
- Dec 16, 2026, 2:00 PM Pacific Time
- Submission
- mail, hand delivery
Scope of work
- Cold mill 1.5 miles of deteriorated asphalt pavement
- Resurface with DGAC asphalt pavement
- Repair 400 linear feet of damaged concrete sidewalks and curbs
- Install 150 feet of gravel trenches
- Replace traffic striping and signage on 12 intersections
Steps to Bid
- 1
Register with the City of Riverside procurement portal or vendor database if not already registered.
- 2
Review the full solicitation and all attached documents (if available) to understand scope, specifications, and submission requirements.
- 3
Submit questions to the designated contact, Jason Jones, by the deadline specified in the solicitation (if any).
- 4
Prepare and submit a complete bid package, including the signed bid form, bid bond, and any required certifications, by the due date and time. by Dec 16, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
91200, 91300, 91319, 91350, 91371, 91382, 91384, 91395, 91396, 92500
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project entails street maintenance improvements within various locations of the City of Riverside. The project generally includes but is not limited to cold milling of existing deteriorated asphalt pavement, the application of ARAM; CSPB; resurfacing asphalt pavement with DGAC; slurry sealing streets, repairing damaged concrete sidewalks, driveways, pedestrian ramps, curb/gutters, and cross gutters; landscaping; irrigation; the installation of gravel trenches; replacement of traffic striping; signage enhancements; excavating existing alleyways; transporting and installing asphalt millings from another location within the project.
Key dates
- Bids due
- Dec 16, 2026
More from this agency
- Park Avenue Water Transmission Main Replacement · closes Dec 3, 2026
- Deputy Inspection, Materials Testing, and Reporting Services for the Police Headquarters Administration Building Project · closes Dec 4, 2026
- Site Modifications at the Palmyrita Water Treatment Plant for PFAS Removal · closes Dec 16, 2026
- Non-Functional Turf Replacement Design-Build Services · closes Dec 18, 2026
- Development of Evacuation Assessment, Plan, and Re-Entry Support Function Annexes · closes Dec 30, 2026
Similar bids near Riverside
- De Palma Road Electrical Conduit Installation Project · Riverside · closes Dec 3, 2026
- Pavement Rehabilitation for 28 Local Streets in CDBG Target Areas, City of Moreno Valley · Moreno Valley · closes Dec 4, 2026
- Hidden Hills Road Pump Out Water Improvements · Yorba Linda · closes Dec 8, 2026
- Slab Replacement, RHMA Paving, and Signal and Lighting System Modifications — Route 5, Orange County · Orange County · closes Dec 2, 2026
- Hydrogen-Based Zero-Emission On-Road Mobile Source Technology Development, Demonstration, Deployment, Workforce… · Diamond Bar · closes Dec 4, 2026
Closing soon near Riverside
- Airport BAER Weed Treatment · Corona · closes Nov 30, 2026
- Carter HVAC Replacement · Rialto · closes Dec 1, 2026
- Garments and Apparel for Direct-to-Garment (DTG), Direct-to-Film (DTF), and Embroidery · Riverside · closes Dec 2, 2026
- Optical Spectrum Analyzer for GPS-Denied Timing Research · Norco · closes Dec 2, 2026
- Purified Water Replenishment SJV Advanced Water Purification Facility · Perris · closes Dec 3, 2026