2026 Bridge Riprap Repair Bid Package
Cheboygan County Road CommissionCheboygan, Michigan#A497.X.123.08
The work includes placing approximately 106.2 cubic yards of riprap across six sites, with volumes ranging from 1.1 to 53.5 cubic yards. The County will supply the riprap material; the contractor is responsible for hauling and placing it. Work must be completed by April 30, 2027, with a preference for completion by December 31, 2026. The contractor must comply with MDOT standards, implement soil erosion control measures, and coordinate with utility owners under Public Act 174. A valid EGLE permit (WRP050956 v.1) is required. The contractor must submit a Material Source List (MDOT Form 501), a progress schedule, and other submittals prior to work start. Traffic control must be maintained, with lane closures limited to 1 mile and non-working hours used to maintain two-way traffic. The contractor must maintain access for school buses, emergency services, and residents. The successful bidder must provide a performance bond and payment bond equal to the contract price.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 30 days from project start date
- Documents analyzed
- 1
Scope of work
- Place 12 cubic yards of riprap at Structure 1543 (Pigeon River Rd over Pigeon River)
- Place 53.5 cubic yards of riprap at Structure 1548 (White Rd over Sturgeon River)
- Place 10.9 cubic yards of riprap at Structure 1549 (Freeway Trail over Sturgeon River)
- Place 11.4 cubic yards of riprap at Structure 1550 (Webb Rd over Little Pigeon River)
- Place 4.7 cubic yards of riprap at Structure 1556 (McEachron Rd over W Br Sturgeon River)
- Place 6.7 cubic yards of riprap at Structure 1557 (Old Sturgeon Rd over W Br Sturgeon River)
Steps to Bid
- 1
Review the full bid package, including plans, specifications, special provisions, and the EGLE permit (WRP050956 v.1).
- 2
Attend the pre-construction meeting (scheduled by the Road Commission prior to project start) to submit required submittals.
- 3
Submit a bid bond equal to 100% of the bid amount, as required by Michigan law. by Dec 1, 2026, 11:00 AM
- 4
Ensure all required submittals (Material Source List, progress schedule, etc.) are submitted prior to project start.
What you'll need
Contract duration
30 days from project start date
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The project requires a total of approximately 106.2 cubic yards of riprap, plain, with individual site volumes ranging from 1.1 to 53.5 cubic yards. Straits Hwy, Indian River, MI 49749. The Contractor is responsible for hauling and placing the material at each site as directed. The Contractor shall coordinate with utility owners and comply with Public Act 174 (Miss Dig) requirements. The project is subject to a Michigan Department of Environment, Great Lakes, and Energy (EGLE) permit (WRP050956 v.1), which expires November 9, 2031.
Documents
- A497.X.123.08-FHWA-Bridge-Riprap-Repair.pdf20 pages
More from this agency
Similar open bids
- Purchase of a 23–26 ft Aluminum Research Vessel with Trailer — Lake Superior State University
- Alumni Memorial Hall – Loading Dock Air Barrier and Soffit Replacement — Regents of the University of Michigan
Closing this week nearby
- Housing Quality Standards (HQS)/National Standards for the Physical Inspection of Real Estate (NSPIRE) Inspection… — closes Nov 20, 2026
- BP08 – Novi HS Innovation Hub Building — closes Nov 20, 2026
- High School Performing Arts 1 (Fire Protection) – Bid Opening 11/20/26 — closes Nov 20, 2026
- RFP Independent Review of School of Medicine Admissions and Student Success - 2026 — closes Nov 20, 2026