OpenConstruction

2026 Bridge Riprap Repair Bid Package

Cheboygan County Road CommissionCheboygan, Michigan#A497.X.123.08

The work includes placing approximately 106.2 cubic yards of riprap across six sites, with volumes ranging from 1.1 to 53.5 cubic yards. The County will supply the riprap material; the contractor is responsible for hauling and placing it. Work must be completed by April 30, 2027, with a preference for completion by December 31, 2026. The contractor must comply with MDOT standards, implement soil erosion control measures, and coordinate with utility owners under Public Act 174. A valid EGLE permit (WRP050956 v.1) is required. The contractor must submit a Material Source List (MDOT Form 501), a progress schedule, and other submittals prior to work start. Traffic control must be maintained, with lane closures limited to 1 mile and non-working hours used to maintain two-way traffic. The contractor must maintain access for school buses, emergency services, and residents. The successful bidder must provide a performance bond and payment bond equal to the contract price.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
30 days from project start date
Documents analyzed
1

Scope of work

  • Place 12 cubic yards of riprap at Structure 1543 (Pigeon River Rd over Pigeon River)
  • Place 53.5 cubic yards of riprap at Structure 1548 (White Rd over Sturgeon River)
  • Place 10.9 cubic yards of riprap at Structure 1549 (Freeway Trail over Sturgeon River)
  • Place 11.4 cubic yards of riprap at Structure 1550 (Webb Rd over Little Pigeon River)
  • Place 4.7 cubic yards of riprap at Structure 1556 (McEachron Rd over W Br Sturgeon River)
  • Place 6.7 cubic yards of riprap at Structure 1557 (Old Sturgeon Rd over W Br Sturgeon River)

Steps to Bid

  1. 1

    Review the full bid package, including plans, specifications, special provisions, and the EGLE permit (WRP050956 v.1).

  2. 2

    Attend the pre-construction meeting (scheduled by the Road Commission prior to project start) to submit required submittals.

  3. 3

    Submit a bid bond equal to 100% of the bid amount, as required by Michigan law. by Dec 1, 2026, 11:00 AM

  4. 4

    Ensure all required submittals (Material Source List, progress schedule, etc.) are submitted prior to project start.

What you'll need

Contract duration

30 days from project start date

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project requires a total of approximately 106.2 cubic yards of riprap, plain, with individual site volumes ranging from 1.1 to 53.5 cubic yards. Straits Hwy, Indian River, MI 49749. The Contractor is responsible for hauling and placing the material at each site as directed. The Contractor shall coordinate with utility owners and comply with Public Act 174 (Miss Dig) requirements. The project is subject to a Michigan Department of Environment, Great Lakes, and Energy (EGLE) permit (WRP050956 v.1), which expires November 9, 2031.

Documents

  • A497.X.123.08-FHWA-Bridge-Riprap-Repair.pdf20 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby