2026 Region 2 VMS Replacements
Department of Transportation — 7304225 - Region 2Oregon#S-73000-00018397
ODOT is seeking one qualified contractor to replace two existing variable message signs with new, agency furnished ones. Discipline: Ordinary Construction Procurement Method: Competitive Sealed Bid Buyer: Joanne Robinson
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 3, 2026
- Time stated in bid documents
- Dec 3, 2026, 2:00 PM Pacific Time
- Submission
- electronic portal
- Documents analyzed
- 5 published · 4 analyzed
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Provide work zone traffic control.
- Pick up and install agency-furnished variable message signs, cabinets, and control cables.
- Furnish and install riser frames, camera mounting assemblies, conduit, framing channel, conductors, structure mounting members, and brackets.
Steps to Bid
What you'll need
Contract duration
June 30, 2027 (Substantial Completion); July 31, 2027 (Final Completion)
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project is located on Santiam Highway (US20) MP 31.27 EB and North Santiam Highway (OR22) MP 48.86 EB. The contract duration for substantial completion is June 30, 2027, and final completion is July 31, 2027.
Key dates
- Bids due
- Dec 3, 2026
Documents
- 00018397_ITB.docx
- Att_A_Plans_21.pdf10 pages
- Att_B-1_Specifications.docx
- Att_B-2_Agency_Furnished_Material.pdf1 pages
- Att_C_Bid_Pricing_Form_76.xlsx
More from this agency
- Transportation Land Use Planning Price Agreement — closes Nov 20, 2026
- Right-of-Way Fencing Removal, Replacement, and Access Gate Installation — I5 Albany — closes Nov 24, 2026
- Bend Shop Plasma Table Rebid — closes Dec 2, 2026
- ESB Chiloquin & OR 58 Stockpile Site Fencing — closes Dec 3, 2026
- US 26 at SE 67th and SE 80th to SE 82nd Project — closes Dec 3, 2026
Closing this week nearby
- Metro 1:1 Coaching Session at West Side Small Biz Open House — closes Nov 20, 2026
- 3417--VR&E Laser equipment acquisition for Veteran — closes Nov 20, 2026
- Vegetables Frozen, Assorted — closes Nov 20, 2026
- STEM Plan Implementation Support Contractor — closes Nov 20, 2026