OpenConstructionCloses Dec 16, 2026, 11:30 AM CT

2027-B-Bayview Drive Bridge Replacement - ALDOT: ST-002-999-012

DaphneDaphne, Baldwin, Alabama#20260417

The City of Daphne, Alabama, is soliciting sealed bids for the replacement of the Bayview Drive bridge over D’Olive Creek, including bridge removal and replacement and associated roadway work. Bids must be submitted by 11:30 A.M. on December 16, 2026, at Daphne City Hall. A 5% bid bond, not exceeding $10,000, is required. A mandatory pre-bid conference is required on December 2, 2026, at 10:00 A.M.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 16, 2026, 11:30 AM CT
Time stated in bid documents
Dec 16, 2026, 11:30 AM Central Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Required submission items
4 items · full checklist with Pro

Scope of work

  • Remove existing bridge structure
  • Construct new bridge with roadway approaches
  • Submit bid bond of 5% (max $10,000)

Steps to Bid

  1. 1

    Register with the City of Daphne and obtain the bid package from the Issuing Office at 7101 US Hwy 90, Daphne, AL 36526, or request digital specifications from Evan Bedwell at [email available with Pro].

  2. 2

    Attend the mandatory pre-bid conference on December 2, 2026, at 10:00 A.M. at Daphne City Hall. by Dec 2, 2026, 10:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project is designated as Bid Document No. 2027-B-Bayview Drive Bridge Replacement - ALDOT: ST-002-999-012. Bids must be submitted by 11:30 A.M. on December 16, 2026, at Daphne City Hall, 1705 Main Street, Daphne, AL 36526. Bids received after the deadline will not be considered. The bond must be issued by a surety company authorized to operate in Alabama or a cashier’s check drawn on an Alabama bank, payable to the City of Daphne. A performance bond in the amount of the contract price and a labor and materials bond in the same amount are required at the time of contract execution. The City reserves the right to reject any or all bids, waive informalities, and modify the contract price. Liquidated damages will apply for failure to complete the work within the contract time. Bidders must not include speculative or anticipated tariffs in their bid price; only tariffs in effect as of the bid submission deadline may be considered. If tariffs are imposed after the deadline, the contractor may request a change order under the contract’s price-escalation clause. The Engineer for the project is Evan Bedwell of Thompson Engineering. Bidding documents are available for inspection at the Issuing Office, 7101 US Hwy 90, Daphne, AL 36526, Monday through Friday. Digital copies of the specifications may be obtained by contacting Evan Bedwell at [email available with Pro]. No documents will be issued later than 24 hours before the bid opening. No questions will be answered after 48 hours before the bid opening. The City may disqualify bidders who have had prior demands placed on a bid, performance, or payment bond within the past five years. The City may conduct investigations into the responsibility, qualifications, and financial ability of bidders and proposed subcontractors. No bid may be withdrawn for 60 days after the bid opening without the City Council’s consent. All prospective bidders must have a representative present. The City is an Equal Opportunity Employer.

Key dates

Pre-bid meeting
Dec 2, 2026, 10:00 AM Central Time
Bids due
Dec 16, 2026, 11:30 AM CT

Similar open bids

Closing this week nearby