OpenRFQCloses Jan 8, 2027, 2:00 PM CT

2027 Potable Water Infrastructure Plan

San Antonio Water SystemSan Antonio, Bexar, Texas#PS-00197-MM

The selected consultant will conduct a 30-year strategic assessment of SAWS’s potable water system, including hydraulic model validation, infrastructure condition and capacity evaluation, and development of a prioritized capital improvement program. The scope covers 8,000 miles of water mains, 150+ production facilities, and 60 pressure zones. Firms must demonstrate experience in large-scale water system planning, modeling, and asset management. Submittals are due January 2027. The project will begin April 12, 2027, with final deliverables due by March 2029. The selected firm will be awarded after SAWS Board consideration in April 2027.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 8, 2027, 2:00 PM CT
Time stated in bid documents
Jan 8, 2027, 2:00 PM Central Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
7 items · full checklist with Pro

Scope of work

  • Prepare a comprehensive review of the existing condition and capacity of SAWS’s potable water infrastructure.
  • Update, calibrate, and validate the potable water production and distribution system hydraulic model.
  • Develop a prioritized list of required improvements for construction over a 30-year window.
  • Provide project justifications, phasing considerations, and engineer’s opinion of probable construction costs.
  • Integrate recommendations into the 5- and 10-year Capital Improvement Plans (CIP).

Steps to Bid

  1. 1

    Register with SAWS Business Center and obtain access to the solicitation portal.

  2. 2

    Attend the non-mandatory in-person pre-submittal conference on December 16, 2026, by 3:00 p.m. CST. by Dec 16, 2026, 3:00 PM

  3. 3

    Submit written questions by December 30, 2026, by 3:00 p.m. CST. by Dec 30, 2026, 3:00 PM

  4. 4

    Review the Q&A posted on the SAWS website on January 8, 2027, by 2:00 p.m. CST. by Jan 8, 2027, 2:00 PM

  5. 5

    Await evaluation and potential interview in February–April 2027. by Apr 30, 2027

What you'll need

Submission

Mail, Hand delivery

NAICS

541330

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 7-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes updating, calibrating, and validating the hydraulic model of the potable water production and distribution system, and developing a prioritized list of capital improvements over a 30-year window based on capacity, condition, regulatory drivers, risk, and operational benefits. The plan will also support growth forecasting for water and sewer service areas and serve as a strategic document for future capital project implementation. The project will be executed in phases beginning April 12, 2027, with all deliverables finalized by March 2029. The evaluation will be based on team experience (30 points), past performance (25 points), technical approach (30 points), and SBOP participation (15 points).

Key dates

Questions due
Dec 30, 2026, 3:00 PM Central Time
Pre-bid meeting
Dec 16, 2026, 3:00 PM Central Time
Bids due
Jan 8, 2027, 2:00 PM CT
Expected award
Apr 30, 2027

Documents

  • PS-00197-MM_Evaluation_Criteria_Forms_Final_11.11.2026.docx

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby