2027 Potable Water Infrastructure Plan
San Antonio Water SystemSan Antonio, Bexar, Texas#PS-00197-MM
The selected consultant will conduct a 30-year strategic assessment of SAWS’s potable water system, including hydraulic model validation, infrastructure condition and capacity evaluation, and development of a prioritized capital improvement program. The scope covers 8,000 miles of water mains, 150+ production facilities, and 60 pressure zones. Firms must demonstrate experience in large-scale water system planning, modeling, and asset management. Submittals are due January 2027. The project will begin April 12, 2027, with final deliverables due by March 2029. The selected firm will be awarded after SAWS Board consideration in April 2027.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 8, 2027, 2:00 PM CT
- Time stated in bid documents
- Jan 8, 2027, 2:00 PM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Prepare a comprehensive review of the existing condition and capacity of SAWS’s potable water infrastructure.
- Update, calibrate, and validate the potable water production and distribution system hydraulic model.
- Develop a prioritized list of required improvements for construction over a 30-year window.
- Provide project justifications, phasing considerations, and engineer’s opinion of probable construction costs.
- Integrate recommendations into the 5- and 10-year Capital Improvement Plans (CIP).
Steps to Bid
- 1
Register with SAWS Business Center and obtain access to the solicitation portal.
- 2
Attend the non-mandatory in-person pre-submittal conference on December 16, 2026, by 3:00 p.m. CST. by Dec 16, 2026, 3:00 PM
- 3
Submit written questions by December 30, 2026, by 3:00 p.m. CST. by Dec 30, 2026, 3:00 PM
- 4
Review the Q&A posted on the SAWS website on January 8, 2027, by 2:00 p.m. CST. by Jan 8, 2027, 2:00 PM
- 5
Await evaluation and potential interview in February–April 2027. by Apr 30, 2027
What you'll need
Submission
Mail, Hand delivery
NAICS
541330
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The scope includes updating, calibrating, and validating the hydraulic model of the potable water production and distribution system, and developing a prioritized list of capital improvements over a 30-year window based on capacity, condition, regulatory drivers, risk, and operational benefits. The plan will also support growth forecasting for water and sewer service areas and serve as a strategic document for future capital project implementation. The project will be executed in phases beginning April 12, 2027, with all deliverables finalized by March 2029. The evaluation will be based on team experience (30 points), past performance (25 points), technical approach (30 points), and SBOP participation (15 points).
Key dates
- Questions due
- Dec 30, 2026, 3:00 PM Central Time
- Pre-bid meeting
- Dec 16, 2026, 3:00 PM Central Time
- Bids due
- Jan 8, 2027, 2:00 PM CT
- Expected award
- Apr 30, 2027
Documents
- PS-00197-MM_Evaluation_Criteria_Forms_Final_11.11.2026.docx
More from this agency
- Blade Reciprocating Saw Metal 9 Inch 8 TPI 5 Per Pack — closes Nov 23, 2026
- Blade Reciprocating Saw Metal 9 Inch 8 TPI, 5 Per Pack — closes Nov 23, 2026
- Annual Contract for Overhead Hoist, Crane, and Monorail Inspection, Testing, and Minor Repairs Not Exceeding $1,500 — closes Nov 23, 2026
- Annual Contract for Laterals to People/Laterals Sewer Improvement Program — closes Nov 24, 2026
- NSIGHT Vision Opticam Equipment Maintenance - Multi-Year — closes Nov 30, 2026
Similar open bids
- Mobile Restroom Facility Supply, Installation, and Maintenance at DPS Livingston Location — Department Of Public Safety - 405
- Fire Hydrant Maintenance, Repair & Replacement Services — City of Grand Prairie
- Annual Requirements Contract for Fire Hydrants — City of Arlington
- CWA2606 Water Distribution Rehabilitation — City of Sugar Land
- Invitation to Bid — Water Distribution System Services — Fort Bend County Municipal Utility District No. 277
Closing this week nearby
- NCLEX Predictor and Remediation Examination Platform for Army 68C Practical Nurse Course — closes Nov 23, 2026
- Severe Ocular Surface Stem Cell Transplantation (OSSTx) Integrated Support and Training Capability — closes Nov 23, 2026
- Bid Packet for Used Dozer — closes Nov 23, 2026
- Cat D5H Series II Dozer — closes Nov 23, 2026
- Local Let Maintenance Contract for Highway SH0048, Cameron County, TX — closes Nov 23, 2026