OpenConstruction

2027 WTHS Roof Work - Phase V - Bid Drawing Manual

Warren Township High School District 121Gurnee, Illinois

This is a bid drawing manual for Phase V of the 2027 roof replacement project at Warren Township High School District 121 in Gurnee, IL. The manual includes construction drawings and specifications for roofing work, including replacement of roof membranes, flashing, insulation, and associated components. The solicitation is for construction services. No bid number, due date, or contact information is stated in the provided materials. The documents are hosted on the district’s official website.

On PublicBidSearch: the original bid posting and 1 bid document for this bid.

Open Original Bid Source Pro

Scope of work

  • Install insulation and vapor barriers per specifications
  • Complete roofing work in accordance with bid drawings and standards
  • Perform work at Gurnee, IL site during 2027 construction season
  • Comply with all local building codes and safety regulations

Steps to Bid

  1. 1

    Review the bid drawing manual and associated documents for scope, specifications, and submission requirements.

  2. 2

    Contact the district’s business office for any clarifications or questions prior to submission.

  3. 3

    Prepare and submit a complete bid package by the deadline, if one is later published.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The manual is issued by Warren Township High School District 121, Illinois, and is intended for use by contractors submitting bids for the project.

Documents

  • Phase_V_Roof_Bid_Drawing_Manual_11.17.26.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Gurnee

Closing soon near Gurnee