Freight ITS Planning and Pedestrian Bridge Design

Fairburn, City OfGeorgia#PE-66073-NONST-2027-000000051

The scope includes project management, stakeholder engagement, data collection, environmental review (NEPA), and final design for both the bridge and ITS. The contract term ends April 30, 2029. The City retains all rights to submitted materials and may reject any proposal. No travel or per diem reimbursement will be provided.

Open Original Bid Source Pro

Overview

Due
Dec 7, 2026
Time stated in bid documents
Dec 7, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery
Contract term
Contract term Schedule to meet planned NEPA completion September 5, 2027, and project completion April 30, 2028; overall grant performance ends April 30, 2029.
Documents analyzed
1
Required submission items
5 items · full checklist with Pro

Scope of work

  • Design a pedestrian bridge over US 29 and CSX rail line near Harbor Lake
  • Create connections to MARTA stops, Bohannon Road, and Logistics Center Drive
  • Plan and assess freight ITS to alert drivers to rail or terminal blockages
  • Conduct stakeholder engagement with workers, employers, and agencies
  • Complete NEPA environmental review with planned completion September 5, 2027
  • Deliver final PS&E package for construction procurement

Steps to Bid

  1. 1

    Submit questions in writing to [email available with Pro] by Friday, November 20, 2026, at 4:00 PM. by Nov 20, 2026, 4:00 PM

  2. 2

    Submit one searchable PDF, one unbound original, and four bound original copies of the proposal to the City of Fairburn at 314 NW Broad Street, Fairburn, GA 30213. by Dec 7, 2026, 2:00 PM

  3. 3

    Do not include prices, fee schedules, or labor rates in the technical submission. A detailed fee proposal will be requested only from the highest-ranked team. by Dec 7, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

541330, 541610, 541620, 541690

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 5-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes two main components: (1) development of construction-ready engineering design plans for an accessible pedestrian bridge over US 29 and the CSX railway near Harbor Lake, with connections to MARTA stops, Bohannon Road, and Logistics Center Drive; and (2) planning and analysis of an ITS system to alert freight drivers to rail or terminal blockages, enabling informed routing decisions. The consultant must conduct project management, stakeholder engagement, existing conditions assessment, environmental review (NEPA), and technical design for both components. Deliverables include a Project Management Plan, Existing Conditions and Needs Report, public engagement materials, draft and final design documents, ITS planning recommendations, and an implementation roadmap. The City reserves the right to reject any proposal and will not reimburse any costs associated with proposal preparation.

Key dates

Questions due
Nov 20, 2026, 4:00 PM Eastern Time
Bids due
Dec 7, 2026

Documents

  • 202611_supportingdocs_PE-66073-NONST-2027-000000051-2026-11-04_11_29_11-bff5.pdf16 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby