Boynton Harbor Marina Fuel System Electrical Conduit & Piping Transition Sump Repairs
City of Boynton BeachBoynton Beach, Florida#27-014B
The City of Boynton Beach is soliciting sealed bids for the repair of the fuel system electrical conduit and piping transition sump at Boynton Harbor Marina. Work includes replacing corroded rigid metal conduit with marine-grade rigid aluminum conduit, repairing electrical fittings and entry boots, raising all fittings 6 inches above the finished surface, and coordinating inspections with the Engineer, Owner, and Florida DEP. The project must comply with FAC 62-761, 40 CFR Part 280, and applicable building and fire codes. Bidders must be qualified and experienced. The pre-bid conference and site visit are mandatory. Bids must be submitted electronically via the City’s e-procurement system by 3:00 PM EST on December 1, 2026.
On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 1, 2026
- Time stated in bid documents
- Dec 1, 2026, 3:00 PM Eastern Time
- Submission
- electronic portal
Scope of work
- Repair and replace deteriorated electrical fittings and entry boots
- Repair product piping entry boots at gasoline and diesel sumps using ICON
- Coordinate and pass all required inspection hold points with Engineer, Owner, and Florida DEP
Steps to Bid
- 1
Register on the City of Boynton Beach e-procurement portal at Official linkPro
- 2
Download the full bid package from Official linkPro
- 3
Attend the mandatory pre-bid conference and site visit on November 16, 2026, at 11:00 AM EST was Nov 16, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Submit all required documents and bid via the e-procurement system before 3:00 PM EST on December 1, 2026 by Dec 1, 2026, 3:00 PM
What you'll need
Submission
Electronic portal
NAICS
238290, 238299
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
27-014B documents. All work must comply with federal, state, county, and local regulatory requirements including FAC 62-761 (Florida UST Regulations), 40 CFR Part 280, 2023 Florida Building Code (8th Ed.), 2023 Florida Fire Prevention Code (8th Ed.), NFPA 30, 30A, 303, and NEC (NFPA 70). The contractor shall act as an independent contractor and not as an employee of the City.
Key dates
- Pre-bid meeting
- Nov 16, 2026, 11:00 AM Eastern Time
- Site visit
- Nov 16, 2026, 11:00 AM Eastern Time
- Bids due
- Dec 1, 2026
More from this agency
Similar bids near Boynton Beach
- Lift Station (LS) Generators Furnish and Install · Riviera Beach · closes Dec 10, 2026
- Qualification Application · West Palm Beach · closes Mar 30, 2029
- Request for Prequalification (RPQ) for Electrical Services — Standing Contract · West Palm Beach · closes Aug 21, 2028
- Replacement of the Existing SCADA Radio Communication System · Lauderhill · closes Nov 30, 2026
- Lift Station E-08 Backup Electrical Power Generator Project · Hollywood · closes Dec 9, 2026
Closing soon near Boynton Beach
- Landscaping and Grounds Maintenance Services – Request for Proposals · Hypoluxo · closes Nov 30, 2026
- Landscaping and Grounds Maintenance Services · Hypoluxo · closes Nov 30, 2026
- in the subject line of any e-mail regarding this solicitation · Palm Beach · closes Dec 2, 2026
- Request for Proposals: CRA No. 2026-05 – SW 600, 700, & 800 Blocks of West Atlantic Avenue Mixed-Use Development Project · Delray Beach · closes Dec 2, 2026
- Ringdown and Crash Phone System · Boca Raton · closes Dec 4, 2026