ClosedRFQ

27RQ0196/FY27 UPS Maintenance Service

State of Alabama - Information Technology GeneralAlabama#SRC0000037529

The State of Alabama - Information Technology General is soliciting bids for annual maintenance on a single Eaton 9355 UPS and battery system at 5898 CR 41, Clanton, AL. The service includes two semi-annual PM visits (one Major, one Minor), 7x24x365 emergency response with under 30-minute phone response and 8-hour onsite arrival, and labor and parts coverage (excluding batteries, capacitors, and fans). Service is performed by trained technicians.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 6, 2026, 11:59 PM CT
Time stated in bid documents
Nov 6, 2026, 11:59 PM Central Time
Submission
online portal

Steps to Bid

  1. 1

    Register on Official linkPro if not already registered.

  2. 2

    Submit a bid via the Official linkPro portal by the due date and time. was Nov 6, 2026, 11:59 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Online portal

NAICS

541512, 541519

Get alerts for bids like this

New furniture and equipment bids in Alabama

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Annual maintenance on listed UPS and battery equipment, covering labor and all parts that have failed under normal wear and tear (excluding batteries, capacitors, and fans as consumables). The Full Coverage (Gold) Semi-Annual PM Agreement includes two Preventive Maintenance (PM) visits: one Major PM and one Minor PM, plus corrective maintenance as required. Corrective service is available 7x24x365 with phone response under 30 minutes and 8-hour onsite response. PM visits are scheduled during normal working hours. Guaranteed 8-hour on-site emergency response, 7 days/week, 24 hours/day. Includes parts and labor on covered UPS equipment (excluding proactive full bank capacitor, fan, and battery replacement). Includes labor and travel coverage 7 days/week, 24 hours/day. Minor PM consists of visual inspection only. Battery maintenance during Major and Minor PM includes: visual inspection of batteries; check for signs of leakage; verification of battery date code; load test of each battery with written report on battery status; and recommendations to ensure UPS operates properly during an outage.

Documents

1 agency-portal link

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby