ClosedIFBClosed Nov 18, 2026, 11:59 PM CT

2nd Street SE Relocation of Interior Vault Utilities

City of Cedar Rapids — Public WorksCedar Rapids, Iowa#321559-02

Work includes relocating sump pits, gas, boiler, HVAC, electrical, communication, and other utilities. The project is a lump sum, no measurement, to be completed in 40 working days from Notice to Proceed. A mandatory pre-bid meeting is required. Bids must be submitted electronically via the IonWave platform. The project is not subject to Iowa or local sales and use taxes.

On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Nov 18, 2026, 11:59 PM CT
Submission
electronic portal
Contract term
40 working days from Notice to Proceed
Documents analyzed
6 published · 5 analyzed

Scope of work

  • Relocate sump pit and sump pump
  • Remove inactive utility conduits
  • Protect site from stormwater runoff and erosion
  • Repair damage from inadequate protection at no cost to the City

Steps to Bid

  1. 1

    Register on the IonWave platform at Official linkPro to access the bid documents.

  2. 2

    Review the bid documents, including the Notice to Bidders, Instructions to Bidders, Project Manual, and attachments.

  3. 3

    Submit questions via the IonWave platform by 11/12/2026 at 4:30 PM (CT). was Nov 12, 2026, 4:30 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Submit the bid electronically through the IonWave platform by 11/18/2026 at 11:00 AM (CT).

What you'll need

Contract duration

40 working days from Notice to Proceed

Submission

Electronic portal

NAICS

237130, 237199

Get alerts for bids like this

New HVAC bids in Iowa

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

Work includes locating, removing, relocating, reconnecting, and protecting interior utilities such as sump pit, gas, boiler, HVAC, electrical, communication, and other utility services. Relocate or replace active interior utilities as necessary. Remove inactive utility conduits that conflict with construction. Inactive conduits must not be abandoned in place and become the property of the contractor. Provide and maintain stormwater runoff, groundwater intrusion, erosion, and sedimentation protection measures. Protect existing and relocated utilities during construction. Repair damage from contractor operations at no additional cost. Construct a new sump pit, install a new sump pump, electrical connections, and appurtenances. Coordinate utility relocations with the Owner before work begins. Obtain and pay for all permits, inspections, and fees. Submit all code-required submittals, designs, calculations, and details. Work with the building owner's representative to coordinate boiler and HVAC adjustments. Completion within 40 working days from Notice to Proceed. Early start: upon receipt of Notice to Proceed. Late start: May 3, 2027. No milestones. Incentive/disincentive of $1,000 per working day, up to $10,000 total. No mailed, hand-delivered, emailed, or faxed submissions accepted.

Documents

  • Notice_to_Bidders_-_321559-02.pdf
  • Bid_Invitation.pdf7 pages
  • Public_Question_Answer.PDF1 pages
  • Bidder_Status_Form.pdf2 pages
  • PROJECT_MANUAL_FINAL_FOR_PRINT_-_321559-02.pdf30 pages
  • Unit_Price_Ref_Sheet.xlsx

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby