OpenSuppliesCloses Dec 16, 2026

3rd BTU & Resiliency Improvements, Phase 2, Parts A & B

City of Holly Hill — WastewaterFlorida#27-WW-08

The City of Holly Hill, Florida, is soliciting bids for Phase 2, Parts A & B of the 3rd BTU & Resiliency Improvements project at the Water Reclamation Facility. Scope includes upgrading filtration systems, installing new chemical feed systems, replacing control panels and SCADA systems, and performing associated electrical and piping work. Additive alternate items include new blowers, pump replacements, and communications upgrades. Questions must be submitted by 5:00 PM ET on December 10, 2026. The project is located in Holly Hill, FL.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 16, 2026
Time stated in bid documents
Dec 16, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery

Scope of work

  • Convert one sand media filter to cloth media filtration
  • Install new sodium bisulfite feed system with pump skid and controls
  • Upgrade chlorine and sulfur dioxide storage and feed systems with HDPE tanks
  • Install buried chemical feed carrier tubing and pull boxes
  • Install PVC diffusers and motorized valves for chemical dispersal
  • Replace SCADA server and integrate new monitoring screens

Steps to Bid

  1. 1

    Register on the City of Holly Hill vendor portal or as a registered vendor with MyVendorLink.

  2. 2

    Submit questions to the contact person by 5:00 PM ET on December 10, 2026. by Dec 10, 2026, 5:00 PM

  3. 3

    Prepare and submit a complete bid response by 2:00 PM ET on December 16, 2026. by Dec 16, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work includes: conversion of one existing traveling bridge automatic backwash sand media filter system to a cloth media filtration system; modification of an existing storage area and chlorine feed room and installation of a new metering pump skid and related piping, valves, and electrical work for a new liquid sodium bisulfite storage and feed system; modification of an existing sulfur dioxide and gaseous chlorine storage building and installation of new HDPE storage tanks, metering pump skids, a liquid chemical feed control panel, fill station control panels, and related piping, valves, and electrical work; installation of new buried chemical feed carrier tubing, containment pipe, and chemical pull boxes to the filter influent, chlorine contact chamber, and effluent pump station wetwell; installation of PVC diffusers, NPW dilution water piping, and motorized control valves for dispersal of dosed chemical at the chlorine contact chamber, filter influent, and dechlorination chamber injection points; and associated electrical work in electrical rooms to incorporate into MCCs and run electrical wire and conduit to equipment. Additive alternate bid items include: installation of a new air blower, piping, concrete pad, and overhead canopy for an existing sludge tank; installation of two new air blowers, piping, concrete pad, and overhead canopy for existing post aeration basins; replacement of two existing wetpit submersible reclaimed water transfer pumps with three new submersible reclaimed water transfer pumps; replacement of pump motors and installation of new variable frequency drives on existing high service reclaimed water pumps; replacement of the plant’s existing SCADA server with a new server hosting a new SCADA system software for the entire plant (all existing and new processes), including process integration and programming to develop new monitoring control screens; replacement of four existing plant master control panels with new control panels; and replacement of existing fiber optic cables, running new communications cables and conduits from all new installed equipment and existing equipment to the plant control system/SCADA.

Key dates

Questions due
Dec 10, 2026, 5:00 PM Eastern Time
Bids due
Dec 16, 2026