OpenConstructionCloses Dec 4, 2026

5.08 mi of Hot Mix Asphalt Cold Milling and Resurfacing, Pavement Markings, Bridge Rehabilitation, and Pedestrian Bridge Demolition on I-94 in Detroit, Wayne County

Michigan Department of Transportation — MDOTMichigan#82024-223349

This is a construction project involving 5.08 miles of hot mix asphalt cold milling and resurfacing, pavement markings, repairs, and drainage work on I-94 in Detroit, Wayne County. It includes bridge rehabilitation on 14th Street over I-94 with beam replacement, heat straightening, and partial deck replacement, and pedestrian bridge demolition, filler wall, and permanent cantilever signing on Brooklyn Street over I-94. The project includes a 3-year materials and workmanship pavement warranty. The contract is for a 3-year term, with completion by October 31, 2027. The solicitation was advertised on October 30, 2026, and bids are due at 10:30 AM local time on December 4, 2026, at the MDOT office in Lansing, MI.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
hand delivery, mail
Contract term
3 years
Documents analyzed
1

Steps to Bid

  1. 1

    Register with MDOT eProp system to access proposal and plans.

  2. 2

    Review the full solicitation, plans, and specifications available at Official linkPro.

  3. 3

    Submit a bid proposal to the MDOT letting office at 425 W. Ottawa St., Lansing, MI 48933, by 10:30 AM local time on December 4, 2026. by Dec 4, 2026, 10:30 AM

  4. 4

    Ensure the bid includes a bid bond of 10% of the total bid amount, as required by the solicitation. by Dec 4, 2026, 10:30 AM

  5. 5

    Attend the pre-bid meeting at 425 W. Ottawa St., Lansing, MI 48933, at 10:30 AM on December 4, 2026, to review the project scope and ask questions. by Dec 4, 2026, 10:30 AM

What you'll need

Contract duration

10/31/2027

Submission

Hand delivery, Mail

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

5.08 miles of hot mix asphalt cold milling and resurfacing, pavement markings, pavement repairs, concrete barrier repairs, concrete patching repairs, and drainage repairs on I-94 from 2nd Avenue to Conner Street in the city of Detroit, Wayne County. The project is part of the federal project number 27A0022. Bids are to be submitted at the Michigan Department of Transportation's letting office in Lansing, MI.

Key dates

Pre-bid meeting
Dec 4, 2026, 10:30 AM Eastern Time
Bids due
Dec 4, 2026

Documents

  • ads.pdf8 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby