OpenRFPCloses Dec 15, 2026

Procurement of 48 Wiring Harnesses (NSN 1HM 6150 014691539)

Dept of the Navy — NAVSUP WEAPON SYSTEMS SUPPORT MECHPennsylvania#N0010427QNA45

CONTACT INFORMATION|4|N744.1|AW4|771-229-3917|[email available with Pro]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specifications C and E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| PRODUCTION LOT TESTING|1|| INSPECTION/ACCEPTANCE POINT|6|TBD|TBD|||TBD|TBD| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications; COMBO - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|TBD|See schedule|TBD|N/A|N/A|N/A|N/A|N/A|N/A|See form DD1423|WAWF Helpdesk | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery|One year from date of delivery||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|One (1)|0001AA|30 Days|TBD|[email available with Pro]|TBD|0001AA|TBD||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEV 2026-O0015)(JUL 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| The purpose of this amendment is to update the TDP as detailed herein and the response date. 1. This requirement is pursuant to Emergency Acquisition Flexibilities (EAF). 2. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. 3. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods suchas email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 4. If requirement will be packaged at a location different from the offeror's address, the offeror shall provide the name, street address, and CAGE of the facility. 5. Any contract awarded as a result of this solicitation will be ;DO; certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded shall be a rated order. 6. NAVSUP WSS Mechanicsburg will be considering past performance in the evaluation of offers IAW FAR 13.106(a)(2). 7. This solicitation requires First Article Testing (FAT). See FAR 52.209-3 First Article Approval - Contractor Testing for more details. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the WIRING HARNESS . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=2865896 |10001| G| |D| | | | DRAWING DATA=2865896 |10001| D|FN |D| | | | DRAWING DATA=2865896 |10001| G|1N |D| | | | DRAWING DATA=6557889 |53711| C| |D| | | | DRAWING DATA=6557906 |53711| E| |D| | | | DRAWING DATA=6557906 |53711| -|PL |D| | | | DRAWING DATA=6557908 |53711| B| |D| | | | DRAWING DATA=6557908 |53711| B|1N |D| | | | DRAWING DATA=6557909 |53711| B| |D| | | | DRAWING DATA=6557910 |53711| B| |D| | | | DRAWING DATA=6557911 |53711| A| |D| | | | DRAWING DATA=6557912 |53711| A| |D| | | | DRAWING DATA=6557913 |53711| D| |D| | | | DRAWING DATA=6557913 |53711| C|1N |D| | | | DRAWING DATA=6557914 |53711| B| |D| | | | DRAWING DATA=6557915 |53711| A| |D| | | | DRAWING DATA=6557916 |53711| A| |D| | | | DRAWING DATA=6557917 |53711| -| |D| | | | DRAWING DATA=6557918 |53711| -| |D| | | | DRAWING DATA=6557919 |53711| A| |D| | | | DRAWING DATA=6557920 |53711| D| |D| | | | DRAWING DATA=6557921 |53711| -| |D| | | | DRAWING DATA=6557942 |53711| B| |A| | | | DRAWING DATA=6557944 |53711| F| |A| | | | DRAWING DATA=6557944 |53711| D|1N |D| | | | DRAWING DATA=7521581 |53711| -| |A| | | | DOCUMENT REF DATA=MIL-STD-12 | | |D |980925|A| | | DOCUMENT REF DATA=ASQ Z1.4 | | | |030101|A| | | DOCUMENT REF DATA=MIL-STD-129 | | |R |180524|A| | | DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | | DOCUMENT REF DATA=ANSI 14.5 | | |M |940101|A| | | DOCUMENT REF DATA=DOD-STD-2101 | | | |790510|A| | | DOCUMENT REF DATA=MIL-S-8660 | | |C |990930|A| 2| | DOCUMENT REF DATA=MIL-I-16923 | | |H |910813|A| | | DOCUMENT REF DATA=MIL-C-22520 |0001| |C |810706|A| 2| | DOCUMENT REF DATA=MIL-STD-100 | | |E |920303|A| |01| DOCUMENT REF DATA=MIL-HDBK-454 | | |B |070415|A| | | DOCUMENT REF DATA=ISO9001 | | | |010417|A| | | DOCUMENT REF DATA=NAVSEA S9320-AM-PRO-020/MLDGR2| | | |130801|D| | | 3. REQUIREMENTS 3.1 Design, Manufacture, and Performance - Except as modified herein, the WIRING HARNESS furnished under this contract/purchase order shall meet the design, manufacture, and performance requirements specified on drawing ;6557906; cage ;53711; . 3.1.1 ;6557906-2; 3.2 ;THE ITEM IS A NON-AVIATION CRITICAL SAFETY ITEM (CSI) WHOSE FAILURE WILL RESULT IN SERIOUS DAMAGE TOEQUIPMENT OR SERIOUS INJURY OR DEATH TO PERSONNEL. Per NAVSEA 6557906 paragraph 12 - Cable testing should be IAW NAVSEA 6557920.; 3.3 Marking - This item shall be physically identified in accordance with ;MIL-STD-129; . 3.4 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore. If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.5 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection. If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part. The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard. If exter

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 15, 2026

Key dates

Bids due
Dec 15, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania