612167 SPRINGFIELD 3 BRIDGE REPLACEMENTS, S-24-017, ST. JAMES AVENUE OVER CSX, S-24-070, TAPLEY STR

Department of Transportation — 0H100 - HIGHWAYSpringfield, Hampden, Massachusetts#BD-27-1030-0H100-0H002-135450

The project includes bridge reconstruction, interchange reconfiguration, roundabout construction, noise barriers, utility relocations, and stormwater improvements. A Letter of Interest is due December 29, 2026, at 12:00 PM. Only parties submitting a timely Letter of Interest will receive the Request for Qualifications (RFQ). Proposers must be prequalified by MassDOT in Complex Bridge and Roadway Design and Bridge Construction (SCL $226M). Joint ventures may combine SCLs. All teams must have 100% bonding capacity. The Statement of Qualifications is due February 2, 2027. A virtual briefing is scheduled for January 12, 2027. Submissions must be made via BidExpress.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 29, 2026
Time stated in bid documents
Dec 29, 2026, 12:00 PM Eastern Time
Submission
email
Contract term
2,000 calendar days from Notice to Proceed
Documents analyzed
2
Required submission items
4 items · full checklist with Pro

Scope of work

  • Replace 3 bridges over I-291 and CSX Railroad (S-24-017, S-24-070, S-24-071)
  • Remove I-291 Eastbound offramp bridge (S-24-072)
  • Reconfigure St. James Avenue/Page Boulevard/I-291 interchange
  • Construct multi-lane roundabout at St. James Avenue and Page Boulevard
  • Build 1,700-foot noise barrier along I-291 Westbound
  • Relocate utilities including gas line, electric duct, streetlight conduit, telecom ducts

Steps to Bid

  1. 1

    Register on BidExpress at Official linkPro and subscribe to the online bidding exchange.

  2. 2

    Submit a Letter of Interest by December 29, 2026, at 12:00 PM (Noon) via email to [email available with Pro]. by Dec 29, 2026, 12:00 PM

  3. 3

    Ensure your firm is prequalified by the MassDOT Architects and Engineers Review Board in Complex Bridge and Roadway Design.

  4. 4

    Ensure your firm is prequalified by the MassDOT Prequalification Committee in Bridge - Construction with a Single Contract Limit (SCL) of at least $226,000,000.00. Joint ventures may combine individual SCLs.

  5. 5

    Attend the virtual briefing on or about January 12, 2027, at 10:00 AM (if invited). by Jan 12, 2027, 10:00 AM

  6. 6

    Receive the Request for Qualifications (RFQ) package on or about December 30, 2026, if your Letter of Interest was timely. by Dec 30, 2026

  7. 7

    Prepare and submit the Statement of Qualifications (SOQ) by February 2, 2027, at 12:00 PM (Noon) via BidExpress. by Feb 2, 2027, 12:00 PM

What you'll need

Insurance

Required

Dewatering shall be conducted in accordance with applicable MassDOT standards, the requirements of the National Pollutant Discharge Elimination System (NPDES), and applicable General Permit for Storm Water Discharges from Construction Activities (CGP) and/or Dewatering and Remediation General Permit (DRGP) issued by the U.S. Environmental Protection Agency (EPA).

Prequalification

Required

Submission

Email

NAICS

237130, 237199

How to submit

All Letters of Interest must be emailed to [email available with Pro]. The Statement of Qualifications must be submitted via BidExpress at Official linkPro.

In person/mail: MassDOT Bid Document Distribution Center, MassDOT Highway Division, 10 Park Plaza, Suite 7874, Boston, MA 02116

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project includes replacement of St. James Avenue bridges (S-24-017 and S-24-071) and Tapley Street bridge (S-24-070), removal of the I-291 Eastbound offramp bridge (S-24-072), reconfiguration of the St. James Avenue/Page Boulevard/I-291 interchange, reconstruction of the St. James Avenue and Page Boulevard intersection into a multi-lane roundabout, construction of a 1,700-foot noise barrier along I-291 Westbound, replacement of the existing ITS camera system, street lighting improvements along St. James Avenue, roadway reconstruction of St. James Avenue, Tapley Street, Page Boulevard, and I-291 ramps, stormwater management including deep sump catch basins and an off-site infiltration basin, utility relocations (including a 12” gas line, electric duct, streetlight conduit, Comcast and telecom ducts on Tapley Street; telecom duct bank and sanitary sewer line on St. James Avenue bridges), and environmental compliance including lead-based paint management and dewatering under NPDES and CGP/DRGP permits. The project will use staged construction to maintain three lanes on I-291 during peak periods, two-way traffic on St. James Avenue, and continuous access for emergency, pedestrian, and bicycle users. The estimated contract value is $226,000,000.00. All bidders must be prequalified by the MassDOT Architects and Engineers Review Board in Complex Bridge and Roadway Design, and by the MassDOT Prequalification Committee in Bridge Construction with a Single Contract Limit (SCL) of at least $226,000,000.00. A virtual briefing will be held on or about January 12, 2027, at 10:00 AM. All submissions must be made via BidExpress at [link available with Pro].

Key dates

Bids due
Dec 29, 2026

Documents

  • 612167_-SPRINGFIELD_-WTO.pdf4 pages
  • 612167_-SPRINGFIELD_-LOI_1.pdf7 pages

See all documents · Download with Pro