8 Bridge Rehabilitations on Route C, 7, and 13 in Henry and St. Clair Counties
Missouri Department of Transportation — MoDOTMissouri#261218-G03
Job JSR0053B: Route C, 7, 13 Henry, ST Clair County. 8 Bridge rehabilitations on Route C and Route 7 in Henry County and Route 13 in St. Clair County (0.428 miles). Contract 261218-G03 (call G03) in MoDOT's December 18, 2026 letting. Bids are submitted electronically through Bid Express.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 18, 2026, 11:00 AM CT
- Bid bond
- Required
- Submission
- electronic portal
- Contract term
- March 1, 2027 to December 1, 2027
- Documents analyzed
- 5 published · 3 analyzed
Scope of work
- Rehabilitate 8 bridges on Route C, 7, and 13.
- Perform roadway work including pavement marking and slab jacking.
- Apply epoxy urethane polymer wearing surface and concrete crack filler on bridges.
- Conduct dewatering and rapid set concrete patching.
- Install FRP pile jacketing systems and epoxy sealer.
- Comply with traffic management, environmental, and safety regulations.
Steps to Bid
What you'll need
Prequalification
RequiredAward method
The bidder shall submit a Bid Guaranty meeting the requirements of Sec 102 of the Missouri Standard Specifications for Highway Construction.
Submission
Electronic portal
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Federal project number(s) include FAS S605(48). The contract includes various roadway items such as construction signs, channelizers, barricades, flashing arrow panels, changeable message signs, mobilization, pavement marking paint, slab jacking material, and surveying and staking. Bridge work includes epoxy urethane polymer wearing surface, concrete crack filler, cored slab drains, and open cell foam joint seal. Liquidated damages will be assessed for administrative costs ($750/day) and road user costs ($3,200/day). The project also addresses work zone traffic management, emergency provisions, migratory bird restrictions, stormwater compliance, and bald eagle protection measures. Prevailing wage rates apply.
Key dates
- Bids due
- Dec 18, 2026, 11:00 AM CT
Documents
- 261218_G03_JSR0053B_BID_BOOK.pdf15 pages
- 261218_G03_JSR0053B_JSP_Roadway.pdf40 pages
- 261218_G03_JSR0053B_JSP_BRIDGE.pdf18 pages
- 261218_G03_JSR0053B_PLANS.pdf23 pages
- 261218_Notice_To_Contractors.pdf8 pages
More from this agency
- Pavement Marking on I-44 in Crawford, Laclede, Phelps, and Pulaski Counties, Missouri · closes Dec 18, 2026
- Resurface 35.886 Miles of Route B and Route C in Bates, St. Clair, and Vernon Counties, Missouri · closes Dec 18, 2026
- Bridge Deck Replacement Over One Hundred and Two River · closes Dec 18, 2026
- Bridge Rehabilitation over Osage River, Cole County · closes Dec 18, 2026
- Bridge Deck Replacement Over Hinkson Creek · closes Dec 18, 2026
Similar bids in Missouri
- Bridge Replacement over Brewers Creek · closes Dec 18, 2026
- Bridge Replacement Over Spring Creek Near Rolla · closes Dec 18, 2026
- Bridge Rehabilitation over Spring Creek near Salem, Route 19, Dent County · closes Dec 18, 2026
- Bridge Deck Replacement Over Loose Creek · closes Dec 18, 2026
- Bridge Replacement Over Dexter Creek and Union Pacific Railroad · closes Dec 18, 2026
Closing soon in Missouri
- Courthouse Annex Foundation Drains Construction · closes Nov 30, 2026
- Herbicide QVL SDA 374-0652 · closes Nov 30, 2026
- Request for Proposal: Insurance Coverage · closes Dec 1, 2026
- Leased Office Space - St. Louis, Missouri · closes Dec 1, 2026
- Instructional Materials for United States History · closes Dec 2, 2026