Asbestos Pipe Insulation Abatement and Reinsulation

City of St. Louis — Supply DivisionSt. Louis, Missouri#2027BID000060

The City of St. Louis, Missouri 63110. The work includes removal of approximately 10 linear feet of accessible asbestos-containing insulation, establishment of a regulated work area with containment and negative pressure, packaging and legal disposal of all asbestos-containing waste, coordination with the City and mechanical contractor, and reinsulation of the affected piping with 1-inch-thick fiberglass insulation, mineral wool at fittings, and PVC protective fittings. The Contractor must comply with all Missouri and federal regulations, including OSHA, EPA, and NESHAP standards. Louis, MO 63103-2842, by 12:00 PM on December 1, 2026.

On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 1, 2026, 12:00 PM CT
Time stated in bid documents
Dec 1, 2026, 12:00 PM Central Time
Submission
mail, hand delivery
Contract term
120 calendar days from Notice to Proceed
Documents analyzed
8

Scope of work

  • Remove one duct vibration cloth for access
  • Package, label, transport, and dispose of all asbestos-containing waste
  • Reinstall 1-inch-thick fiberglass insulation with factory-applied jacket
  • Install mineral wool at fittings and irregular surfaces

Steps to Bid

  1. 1

    Review the full bid package, including the Scope of Work (WD27-1658_Scope_of_Work.pdf), Instructions to Bidders, and all required forms.

  2. 2

    Submit a completed Quotation Sheet with unit prices and extensions for each item, typewritten or in ink, with any altered or erased unit prices initialed. by Dec 1, 2026, 12:00 PM

  3. 3

    Attach the product specification document (WD27-1658_Scope_of_Work.pdf) to the bid submission. by Dec 1, 2026, 12:00 PM

  4. 4

    Ensure all freight or delivery charges are included in the quote or shown separately. by Dec 1, 2026, 12:00 PM

  5. 5

    Bids must arrive no later than 12:00 PM on December 1, 2026, and will be rejected if late. by Dec 1, 2026, 12:00 PM

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 561720

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Contractor shall remove approximately 10 linear feet of accessible asbestos-containing pipe insulation located above the air-handling unit near the Zone 6 work area, and one duct vibration cloth within the work area to provide access to the asbestos-containing material and mechanical repair area. The Contractor shall establish and maintain a regulated work area with containment, negative pressure, worker protection, decontamination, cleaning, and access controls. All asbestos-containing material and project debris shall be packaged, labeled, transported, and legally disposed of at an EPA-authorized or otherwise legally approved facility. The Contractor shall coordinate with the City and the boiler, HVAC, or pipefitting contractor responsible for the related mechanical repairs. After mechanical repairs are completed, the Contractor shall reinstall a complete new insulation system throughout the affected work area using 1-inch-thick fiberglass pipe insulation with a factory-applied paper or all-service jacket, mineral wool at fittings and irregular surfaces, and PVC protective fittings or jacketing at tees and 90-degree elbows. The work is located at 1640 South Kingshighway Boulevard, St. Louis, Missouri 63110, in the Zone 6 air-handling-unit area. The Contractor shall provide all labor, supervision, materials, equipment, permits, notifications, and incidental items required for a complete, code-compliant project. All work must comply with Missouri Department of Natural Resources regulations, U.S. Environmental Protection Agency requirements, federal NESHAP, OSHA asbestos, respiratory-protection, hazard-communication, scaffold, and lockout/tagout standards. The Contractor shall not energize, restart, or operate City equipment without authorization and shall stop work if an affected system is unexpectedly energized. The air-handling unit shall be shut down, de-energized, and locked out before containment installation or asbestos removal begins. The steam system shall be shut down sufficiently in advance so the affected pipe surface is below 150 degrees Fahrenheit before abatement begins. The Contractor shall immediately notify the City of concealed conditions, additional suspected asbestos-containing material, or conditions that materially differ from the stated scope. Material outside the identified limits shall not be disturbed without written authorization. The Contractor shall provide all mobilization, supervision, labor, materials, equipment, tools, ladders or Baker scaffold, permits, notifications, and incidentals necessary for a complete project. Closeout submittals include waste shipment records, landfill manifests, disposal receipts, completed regulatory documentation, required air-monitoring or clearance reports, final quantities of asbestos-containing material removed, daily work records if requested, replacement-insulation product data, applicable warranty information, and written confirmation that required cleaning, abatement, reinsulation, and corrective work are complete. Work is complete only after the identified asbestos-containing material and vibration cloth are removed; the area is cleaned and cleared as required; waste records are submitted; mechanical repairs by others are complete; affected piping is fully reinsulated; deficiencies are corrected; and the City accepts the work.

Key dates

Bids due
Dec 1, 2026, 12:00 PM CT

Documents

  • Ordinance-69431-City-of-St-Louis-Competitive-Disadvantage.pdf2 pages
  • 1_-_Instructions_to_Bidder-Quotations.1-3-21_3_.pdf1 pages
  • 12_-_Bid_Protest_Procedures.pdf2 pages
  • 3 - BUY AMERICA Domestic 12 20 _Fillable_ _9_1_.pdf2 pages
  • 5_-_MINORITY_AND_WOMEN_OWNED_FORM_170-80_MWBE_Form_2_10_Fillable_5_.pdf2 pages
  • 1_-_Attention_Bidders_Fillable_9_.pdf1 pages
  • WD27-1658_Scope_of_Work.pdf5 pages
  • 9_-_Israel-Anti-Discrimination-Affidavit_Fillable_9_.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar bids near St. Louis

Closing soon near St. Louis