Actuator, Electro-Mechanical
Defense Logistics Agency — SPRMM1 DLA MECHANICSBURGPennsylvania#SPRMM127RHA15
The Defense Logistics Agency (DLA) is soliciting offers for an electro-mechanical actuator. The contractor must comply with the latest approved revision of all applicable technical documents, including drawings, specifications, and military standards. The contractor must ensure access to these documents throughout the contract term. All technical data is available via a password-protected portal requiring pre-registration. The contractor must not use any document revision prior to 1 November 1969 unless approved. The contractor must not use portions of different revisions of a document unless approved. The contractor must not perform work at any location other than that specified in the contract without prior written approval. The contractor must not offer any item that does not fully comply with the technical requirements without prior identification of the exception. Requests for waivers or deviations must include full justification, an explanation of the cause of any delay, and an evaluation confirming that the proposed change will not affect the part’s quality, form, fit, or function. The contractor must provide technical data (e.g., catalog page, drawing) for any proposed alternative or replacement item. The contractor must provide an email address for follow-up communications. If not the manufacturer, the contractor must identify the OEM (CAGE code) and part number. The contractor is encouraged to register for automated notifications from Navy Electronic Commerce Online (NECO). All receiving reports and invoices must be submitted electronically via the PIEE-WAWF system. The contract is fixed-price, and delivery days and offer validity period are to be specified by the contractor. The Government may inspect the material at the production site and at the final delivery point. The contractor must provide two full-size, clear, legible prints when submitting a revised drawing for approval.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 19, 2027
- Time stated in bid documents
- Jan 19, 2027, 1:00 PM Eastern Time
- Submission
- electronic portal
- Required submission items
- 4 items · full checklist with Pro
Steps to Bid
- 1
Register for access to technical documents at Official linkPro (requires pre-registration and password).
- 2
Review all applicable technical documents, including IRPOD, drawings, specifications, and military standards.
- 3
Prepare and submit a quote via EDI or other electronic method, including any exceptions or deviations. by Jan 19, 2027, 1:00 PM
- 4
Ensure the quote includes the OEM CAGE code and part number if not the manufacturer. by Jan 19, 2027, 1:00 PM
- 5
Provide an email address for follow-up communications. by Jan 19, 2027, 1:00 PM
- 6
Register for automated notifications from NECO via NAVSUPWSS code 025 (optional but recommended).
What you'll need
Submission
Electronic portal
NAICS
332919
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The item must be manufactured in accordance with the latest approved revision of the applicable drawings, specifications, and software. Technical documentation, including IRPOD, drawings, technical data, STRs, and military specifications, may be obtained via [link available with Pro], which requires pre-registration and a password. The Government reserves the right to deny approval of any change in production facilities, even if the four conditions (no change in small business or labor surplus performance, no delivery delay, no change in f.o.b. point, and a $250 price reduction) are met. The contractor must submit any request for a change in production facilities in writing to the Contracting Officer. The contractor may view orders, contracts, and modifications via the EDA web tool at [link available with Pro]. The contract is a fixed-price, delivery-order type. The contractor must comply with all applicable terms and conditions, including those related to inspection, acceptance, and payment. The contractor must comply with the order of precedence for resolving document conflicts: (1) amendments to the purchase order, (2) schedule of supplies, (3) terms and conditions, (4) IRPOD or master procurement specification, (5) invoked standard technical requirements, (6) referenced drawings, (7) referenced specifications. The contractor must not use any revision of a document dated before 1 November 1969 unless otherwise specified. The contractor must not submit requests for waivers or deviations without sufficient information; such requests will be returned and not reviewed until all required information is provided.
Key dates
- Bids due
- Jan 19, 2027
More from this agency
- Drop Bar Assembly Procurement · closes Jan 19, 2027
- Rectifier, Semiconductor · closes Jan 19, 2027
- MODULE ASSEMBLY,UHF · closes Jan 21, 2027
- Safety Manual Switch · closes Jan 26, 2027
- Module Assembly, Rim · closes Jan 29, 2027
Similar bids in Pennsylvania
- Parts Kit for Size 3 Inch Combination Hull and Backup Ball Valve · closes Dec 11, 2026
- Army Water Heater WH-400 · closes Dec 9, 2026
- 59--ELEC HULL FITTING · closes Dec 11, 2026
- Parts Kit for a Size 2 1/2 x 3 Inch Ball Valve · closes Dec 18, 2026
- Township of Spring Plant No. 3 Headworks Screen Project – General/Process Mechanical Contract
Closing soon in Pennsylvania
- Request for Proposal: Architectural and Engineering Services for New Northview Heights Elementary School · closes Nov 30, 2026
- Valve, Fluid Unit - Procurement of New Manufacturing Spares · closes Nov 30, 2026
- Fiber Optic Lighting Equipment Procurement · closes Nov 30, 2026
- 16--HEAT EXCHANGER,AIR · closes Dec 4, 2026
- 49--NRP,CHERRY PICKER A · closes Dec 4, 2026