OpenRFPCloses Nov 30, 2026

Actuator, Electro-Mechanical

Defense Logistics Agency — DLA AVIATION AT PHILADELPHIA, PAPennsylvania#SPRPA127QYA25

Bidders must be from government-approved sources of supply. Distributors must submit an authorized distributor letter on the source’s letterhead via email at time of proposal. Contractors must comply with MIL-STD-130 for markings and maintain a quality control system meeting Mil-I-45208A, Mil-Q-9858, or ISO 9000/9001/9002 standards. Inspection, repair, and quality documentation must be maintained and made available to the Government. Nonconforming material must be controlled. The contractor may use an Internal Review Board only for minor non-conformances and rework. Formal Material Review Board authority is retained by the Government. Historical records for each CLIN must be maintained. Packaging must comply with MIL-STD-2073. The solicitation is issued under emergency acquisition flexibilities; synopsis is waived.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 3:30 PM Eastern Time
Submission
email
Required submission items
1 items · full checklist with Pro

Steps to Bid

  1. 1

    Register on Official linkPro and ensure active status.

  2. 2

    Review the solicitation on Official linkPro at Official linkPro.

  3. 3

    Prepare and submit a proposal via email to [email available with Pro] by 15:30 ET on 2026-11-30. by Nov 30, 2026, 3:30 PM

  4. 4

    Include an authorized distributor letter on the source’s letterhead if representing an approved source. by Nov 30, 2026, 3:30 PM

What you'll need

Submission

Email

NAICS

336413

How to submit

Submit proposal via email to [email available with Pro]. Include an authorized distributor letter on the source’s letterhead if applicable. All submissions must be received by 15:30 ET on 2026-11-30.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Procurement of electro-mechanical actuators for U.S. Navy use. The contractor is responsible for all inspection requirements unless otherwise specified. Quality control documentation, test and repair procedures, and inspection procedures must be prepared and maintained, including sequential diagrams and performance specifications. A Repair Quality Plan compliant with the above standards must be developed and maintained. Purchased material control systems must ensure contractual requirements are included in all subcontracts. A parts control system must record performance for each purchased and internally manufactured part. Purchased items must be inspected upon receipt at the contractor’s facility to verify conformance with the Technical Data Package (TDP). Inspection reports must include dimensional data, material, finish, process, pass/fail criteria, certifications, and actual readings. Failure analysis and corrective action reports must be submitted to the Government. Nonconforming material must be controlled through identification, segregation, and disposition procedures. The contractor may use an Internal Review Board (IRB) only for minor non-conformances, scrap, or rework to return a part to conformance, and IRB may not use 'AS-IS' disposition. A complete file of IRB actions must be maintained for Government review. Contractors must submit variance requests via DCMC to the NAVSUP Contracting Officer. All items must meet all requirements of the Statement of Work. Inspection requirements become part of the contractor’s overall inspection system. Absence of inspection requirements in the SOW does not relieve the contractor of responsibility to ensure compliance. Sampling does not authorize submission of defective items. The Government may select samples of completed repair items for performance, environmental, and quality conformance testing at CFA or other Government-designated locations. Contractors must maintain a historical record file for each CLIN and assembly, including receipt inspection documentation, repair shop travelers, parts replacement records, parts inspection data, acceptance test data, and QA history cards. Records must be available to the Government upon request. No other provisions apply.

Key dates

Bids due
Nov 30, 2026

More from this agency

Similar bids in Pennsylvania

Closing soon in Pennsylvania