OpenServicesCloses Dec 4, 2026

ADA Vertical Platform Lift Purchase & Installation

Village of IrvingtonIrvington, Westchester, New York#2026-45

The scope includes full installation, testing, training, and warranty. A mandatory site visit on November 18, 2026, at 10:00 AM is required; non-attending bidders may be rejected. Written questions must be submitted by November 20, 2026. Bids must be received by 11:00 AM on December 4, 2026, at Village Hall. Electronic submissions are not accepted. The project is subject to New York State prevailing wage requirements. The Village reserves the right to reject any or all bids. Award will be made to the lowest responsive and responsible bidder.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026
Time stated in bid documents
Dec 4, 2026, 11:00 AM Eastern Time
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
6 items · full checklist with Pro

Scope of work

  • Provide full site measurement and verification of conditions during mandatory site visit
  • Include all carpentry, electrical, and framing modifications required for installation
  • Ensure compliance with ADA Standards, New York State Uniform Code, and ASME A18.1 safety standards

Steps to Bid

  1. 1

    Review the full bid package, including specifications, plans, and all addenda, available at the Village Administrator’s Office or on the Village website.

  2. 2

    Attend the mandatory site visit on Wednesday, November 18, 2026, at 10:00 AM at Village Hall, 85 Main Street, Irvington, NY. Attendance will be recorded. was Nov 18, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit written questions by Friday, November 20, 2026, to [email available with Pro]. Only written addenda issued by the Village are binding. was Nov 20, 2026, 11:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Deliver or mail the bid to Karen Buccheri, Assistant to the Village Administrator, at Village Hall, 85 Main Street, Irvington, NY 10533, and ensure it is received by the deadline. by Dec 4, 2026, 11:00 AM

What you'll need

Contract duration

Substantial completion within ____ calendar days, subject to the approved schedule.

Award method

Award, if made, will be to the lowest responsive and responsible bidder in accordance with applicable law.

Submission

Mail, Hand delivery

NAICS

561720, 561730

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 6-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The lift will serve the first floor and must comply with ADA Standards, New York State Uniform Code, and ASME A18.1 safety standards. The scope includes site measurement, equipment delivery and rigging, carpentry and framing modifications, electrical connections, installation, commissioning, testing, training, and closeout. The contractor must verify actual site conditions during a mandatory site visit. Bidders must submit a lump-sum bid covering all labor, materials, equipment, permits, delivery, installation, testing, training, and warranty. The project is subject to New York State Labor Law Article 8 prevailing wage and supplemental benefit requirements. Bids must be received by 11:00 AM on Friday, December 4, 2026, at Village Hall, 85 Main Street, Irvington, NY 10533. Bids must be delivered or mailed to Karen Buccheri, Assistant to the Village Administrator. Attendance will be recorded; bids from firms that do not attend may be rejected as nonresponsive. Written questions must be submitted by Friday, November 20, 2026, to [email available with Pro]. The project-specific NYSDOL prevailing wage schedule and PRC number (2026031260) have been provided. Plans, specifications, and addenda are available through the Village Administrator’s Office or the Village website. Bidders must confirm they possess all addenda. The contract will be awarded to the lowest responsive and responsible bidder in accordance with applicable law.

Key dates

Questions due
Nov 20, 2026, 11:00 AM Eastern Time
Pre-bid meeting
Nov 18, 2026, 10:00 AM Eastern Time
Site visit
Nov 18, 2026, 10:00 AM Eastern Time
Bids due
Dec 4, 2026

Documents

  • Specifications_9.pdf12 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby