Addison Junction Public Infrastructure Improvements
Town of AddisonAddison, Dallas, Texas#C00057
The Town of Addison is soliciting bids for infrastructure improvements along Festival Way, Julian Avenue, Ace Alley, Arapaho Road, and Spectrum Drive. Scope includes storm drainage, water distribution, wastewater systems, minor utility upgrades, pavement repairs on Spectrum Drive and Arapaho Road, conduit installation along Festival Way, and pedestrian ramp reconstruction. Work also includes site preparation, demolition, traffic control, and erosion and sedimentation control. Bids must be submitted by 2:00 p.m. on December 15, 2026, either online at [link available with Pro] or in person at the Finance Building, 5300 Belt Line Road, Dallas, Texas 75254.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Central Time
- Submission
- online portal, in-person delivery
Scope of work
- Upgrade water distribution and wastewater systems along the same corridors
- Reconstruct pedestrian ramps at intersections along Festival Way
Steps to Bid
- 1
Register or pre-qualify if required
- 2
Submit questions to the contact person by the deadline (not stated)
- 3
Submit bid response by 2:00 p.m. on December 15, 2026 by Dec 15, 2026, 2:00 PM
- 4
Submit bid via online portal at Official linkPro or in person at the Finance Building, 5300 Belt Line Road, Dallas, Texas 75254 by Dec 15, 2026, 2:00 PM
What you'll need
Submission
Online portal, In-person delivery
NAICS
237130, 237199, 237999
How to submit
Bids must be submitted online at Official linkPro or delivered in person to the Finance Building, 5300 Belt Line Road, Dallas, Texas 75254, by 2:00 p.m. on December 15, 2026.
In person/mail: Finance Building, 5300 Belt Line Road, Dallas, Texas 75254
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
The project is bounded by Addison Road to the west, Festival Way to the north, Spectrum Drive to the east, and Arapaho Road to the south. Additional Work includes site preparation and demolition, traffic control, erosion and sedimentation control measures, and all other appurtenant work necessary for completion of the Project in accordance with the plans and specifications.
Key dates
- Bids due
- Dec 15, 2026, 2:00 PM CT
Similar bids near Addison
- Supply of Pre-Mixed and Volumetric Concrete · Dallas · closes Dec 1, 2026
- Seal Coat Work on FM 5 from IH 20 to Muir Road, Parker County, Texas · Parker · closes Dec 2, 2026
- Frankford Road Reconstruction Segment 3 · Carrollton · closes Dec 2, 2026
- DNT Mainlane Improvements from IH-635 to PGBT · Plano · closes Dec 18, 2026
- RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033 · Plano · closes Dec 9, 2026
Closing soon near Addison
- Art Maintenance and Conservation Services · Dallas · closes Dec 1, 2026
- CMAR Raw Wastewater Treatment Plant Improvements · Grapevine · closes Dec 3, 2026
- Condenser Retube Project · Garland · closes Dec 3, 2026
- Roofing Repair, Maintenance, and Waterproofing · Frisco · closes Dec 4, 2026
- Bedding Plants · Allen · closes Dec 4, 2026