OpenOtherCloses Dec 10, 2026

Juneau Shooting Complex Ventilation System Upgrade

Alaska Fish and Game — Fish and GameAlaska#225933

This is a small procurement for the replacement of the ventilation control panel at the Juneau Hunter Education Shooting Complex (JHESC). The work includes removal of the current panel and installation of a new, UL 508A labeled, 60” x 36” panel with specific components including an Allen-Bradley PLC, HMI, and ABB VFDs. The new panel must integrate with existing lighting and ventilation systems, offer surge suppression, temperature control, and a maximum run time function. An electrician is required for installation, and training for the Range Manager is included. Potential vendors must visit the site. Quotes are due by December 10, 2026, at 2:00 PM AKST and can be emailed to [email available with Pro]. The estimated project cost is between $100,001 and $200,000, and any project over $100,000 must be bonded.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 2:00 PM Alaska Time
Submission
email
Documents analyzed
1

Scope of work

  • Replace existing 20+ year old ventilation control panel.
  • Design/purchase and install new UL 508A labeled panel (60"x36").
  • Integrate lighting control with ventilation (low light mode).
  • Provide maximum run time function and auto shutdown.
  • Ensure electrician connection and train Range Manager.

Steps to Bid

  1. 1

    Review all project documents, including the Scope of Work and Instructions to Offerors.

    Offerors are required to follow these instructions and familiarize themselves with the Instructions to Offerors, page 2 of this form, prior to submitting their quote.

  2. 2

    Visit the site to view the current ventilation system and control panel.

    Potential vendors will need to contact the Range Manager to visit the site and view the current ventilation system and control panel (907-586-4101).

  3. 3

    Submit quote via email. by Dec 10, 2026, 2:00 PM

    Quotes can be emailed to [email available with Pro] before the deadline. Late quotes cannot be accepted.

What you'll need

Submission

Email

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

ADF&G is seeking quotes from qualified contractors to replace the ADF&G Juneau Hunter Education Shooting Complex (JHESC) ventilation control panel. The new panel will need to be designed/purchased and installed. It must be capable of turning off lighting while leaving ventilation on for low/no light shooting, and have a function to control maximum run time before auto shutdown. Surge suppression on power entering the control panel is required, as well as temperature control/thermostat integrated with the ventilation system. An electrician will be needed for connection to existing wiring, and training for the Range Manager on proper operations is required. The new panel should also provide a way to turn off heat to Air Handling Unit 2 (AHU2) for air circulation when heat is not needed. A plumber may be needed as the control panel is connected to the boiler system and controls several pumps and valves. It will include (2) 10 HP ABB VFDs with bypass contactors, motor starters, relays, control power, and operator devices, along with conduit, wire, and wiring devices for complete installation. The brand/model must match the current ventilation system.

Key dates

Bids due
Dec 10, 2026

Documents

  • ADFG_IFQ_27-018_-_Juneau_Shooting_Complex_Ventilation_System_Upgrade_-_SPC_P.pdf28 pages

See all documents · Download with Pro

Similar bids in Alaska

Closing soon in Alaska