Advertisement for Bids — Clark County
Clark CountyNevada
The scope includes a new roof covering with all associated components, removal and replacement of sealant and backer rod at exterior wall joints, and full replacement of HVAC equipment in the Central Plant Yard, Utility Rooms, on the roof deck, and in ceiling plenums. Structural support for HVAC equipment and all required plumbing and electrical work must be provided. Bidders must be prequalified with a Nevada Contractor's License in classifications AB, B, B2, or LCR. A mandatory pre-bid conference is scheduled for November 23, 2026, at 10:00 a.m. at 8100 W. Robindale Rd., Las Vegas, NV. Bid documents are available online via Bluebeam or in hard copy from RGS ReproGraphics Solutions. The estimated project value is $18,000,000.00.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 7, 2027
- Time stated in bid documents
- Jan 7, 2027, 1:00 PM Pacific Time
- Submission
- mail, hand delivery
Scope of work
- Replace roof membrane, insulation, flashing, and roof drains
- Replace backer rod and sealant at CMU and EIFS wall joints
- Replace sealant at doors, windows, and glazing systems
- Remove and replace HVAC equipment in chiller room, boiler room, and on roof
- Provide structural support for all replaced HVAC equipment
- Install all required plumbing and electrical work as shown on plans
Steps to Bid
- 1
Attend the mandatory pre-bid conference on-site at 8100 W. Robindale Rd., Las Vegas, NV, on Monday, November 23, 2026, at 10:00 a.m. by Nov 23, 2026, 10:00 AM
- 2
Request digital bid documents via Bluebeam by emailing Tasha Kerper at [email available with Pro].
- 3
Obtain hard copy bid documents from RGS ReproGraphics Solutions, 6645 S. Eastern Ave, Suite 101, Las Vegas, NV 89119, during business hours (8 a.m. to 5 p.m., Mon–Fri).
What you'll need
Prequalification
RequiredSubmission
Mail, Hand delivery
NAICS
236220, 238290, 238990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The Work consists of providing a new roof covering and associated roof components, including roof membrane, protection board, rigid insulation, flashing, roof drain covers, sealants, curbs (where indicated), roof ladder modifications, skylight replacement, roof hatch access replacement, and associated roof components and details as shown on drawings and specifications. The existing backer rod and sealant at exterior wall openings — including exterior doors, windows, glazing systems, louvers, and glass block locations — are to be removed and replaced. Structural support for all replaced or modified HVAC equipment and miscellaneous detail locations must be provided as shown on plans and specifications. The construction estimate for the project is $18,000,000.00. Pre-qualified prime bidders must email Tasha Kerper at [email available with Pro] to request access to the digital bid documents through CCSD's Bluebeam document viewer. Bid documents are also available in hard copy from RGS ReproGraphics Solutions, 6645 S. Eastern Avenue, Suite 101, Las Vegas, NV 89119, (702) 798-2055, during business hours (8 a.m. to 5 p.m., Monday–Friday), at the requestor’s expense. Contractors pre-qualified pursuant to NRS 338.1379 must attend the mandatory pre-bid conference on-site at 8100 W. Robindale Rd., Las Vegas, NV 89113, on Monday, November 23, 2026, at 10:00 a.m. Late arrivals may not be eligible to bid as a prime contractor.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 10:00 AM Pacific Time
- Bids due
- Jan 7, 2027
More from this agency
- Replace Underground Storage Tanks & Fuel Pump Stations — Gunter H. Koepsell Satellite and Monroe Robertson… — closes Nov 24, 2026
- Annual Requirements Contract for Landscape and Grounds Maintenance at Searchlight & Laughlin Parks and Facilities — closes Dec 1, 2026
- Warm Springs Road - Las Vegas Boulevard to Pecos Road — closes Dec 1, 2026
- HVAC Upgrade at Ute V. Perkins Elementary School — Clark County School District — closes Dec 3, 2026
- TSA Innovation Checkpoint Renovation — closes Dec 9, 2026
Similar open bids
- HVAC Maintenance Service — Department of Tourism And Cultural Affairs
- Northern Nevada - HVAC Maintenance Services — Adjutant General
- Wastewater Mechanical Equipment Supplies, Inspections, Maintenance, Repair and Replacement Services — Clark County Water Reclamation District
- HVAC BAS Preventative Maintenance — Department of Tourism And Cultural Affairs
- Annual Boiler and Water Heater Preventative Maintenance, Safety Testing, and Technician Hands-On Training — Adjutant General
Closing this week nearby
- RFP- Douglas County Public Library, A New Five-Year Strategic Plan 2028 to 2033 — closes Nov 21, 2026
- Las Vegas-Clark Co Library District: E-Rate FY2027 Category 2 - Network Switches, Wireless Access Points, and Related… — closes Nov 21, 2026
- Coral Academy of Science Las Vegas: E-Rate FY2027 Category 2 - Wireless Access Points, Switches, Firewalls, and UPS… — closes Nov 22, 2026
- Z1DZ--Replace Dental Vacuum Piping — closes Nov 23, 2026