OpenConstructionCloses Jan 5, 2027

In-Ground Hoist Replacements Project

Grays Harbor Transportation AuthorityWashington

Work includes demolition of existing hoists, foundation modifications, electrical upgrades, site restoration, and relocation of hose reels. One hoist must remain operational during replacement. A 5% bid bond is required. The successful bidder must provide a 100% performance and payment bond.

On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 5, 2027
Time stated in bid documents
Jan 5, 2027, 11:00 AM Pacific Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
electronic portal

Scope of work

  • Replace 2 in-ground bus hoists with new modular axle-engaging lifts
  • Modify existing foundations and electrical systems
  • Relocate hose reels in Bays 2 and 3

Steps to Bid

  1. 1

    The public bid opening will occur via Zoom on January 5, 2027, at 1:30 PM. Access details are in the bidding documents. by Jan 5, 2027, 1:30 PM

What you'll need

Submission

Electronic portal

NAICS

236220, 238290

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Replace two (2) existing in-ground hoists with two (2) new code-compliant, modular in-ground, axle-engaging bus lifts and controls in Bays 2 and 3 at the Grays Harbor Transit Hoquiam Maintenance and Operations Facility (705 30th Street, Hoquiam, WA 98550). Work includes demolition and decommissioning of existing hoists, modifications to existing structural foundations, electrical improvements required to support the new lift systems, coordination and management of new hoist installation (to be installed by manufacturer-approved installer), associated site restoration, and relocation of hose reels located in Bays 2 and 3. The new hoists will be furnished by the Owner. Existing equipment and utilities that conflict with the new installation shall be removed, relocated, or modified as required. Construction shall be phased such that one hoist remains operational during replacement of the other. There shall be minimum disruption of on-going maintenance and administrative activities outside of Bays 2 and 3. The estimated construction cost is $540,000 - $610,000. There is an additive alternate for the removal of contaminated soil estimated at $60,000. A Bid Bond in the amount of 5% of the total bid must accompany each proposal.

Key dates

Pre-bid meeting
Nov 23, 2026, 11:00 AM Pacific Time
Bids due
Jan 5, 2027

More from this agency

Similar bids in Washington

Closing soon in Washington