In-Ground Hoist Replacements Project
Grays Harbor Transportation AuthorityWashington
Work includes demolition of existing hoists, foundation modifications, electrical upgrades, site restoration, and relocation of hose reels. One hoist must remain operational during replacement. A 5% bid bond is required. The successful bidder must provide a 100% performance and payment bond.
On PublicBidSearch: the newspaper notice and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 5, 2027
- Time stated in bid documents
- Jan 5, 2027, 11:00 AM Pacific Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
Scope of work
- Replace 2 in-ground bus hoists with new modular axle-engaging lifts
- Modify existing foundations and electrical systems
- Relocate hose reels in Bays 2 and 3
Steps to Bid
- 1
The public bid opening will occur via Zoom on January 5, 2027, at 1:30 PM. Access details are in the bidding documents. by Jan 5, 2027, 1:30 PM
What you'll need
Submission
Electronic portal
NAICS
236220, 238290
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Replace two (2) existing in-ground hoists with two (2) new code-compliant, modular in-ground, axle-engaging bus lifts and controls in Bays 2 and 3 at the Grays Harbor Transit Hoquiam Maintenance and Operations Facility (705 30th Street, Hoquiam, WA 98550). Work includes demolition and decommissioning of existing hoists, modifications to existing structural foundations, electrical improvements required to support the new lift systems, coordination and management of new hoist installation (to be installed by manufacturer-approved installer), associated site restoration, and relocation of hose reels located in Bays 2 and 3. The new hoists will be furnished by the Owner. Existing equipment and utilities that conflict with the new installation shall be removed, relocated, or modified as required. Construction shall be phased such that one hoist remains operational during replacement of the other. There shall be minimum disruption of on-going maintenance and administrative activities outside of Bays 2 and 3. The estimated construction cost is $540,000 - $610,000. There is an additive alternate for the removal of contaminated soil estimated at $60,000. A Bid Bond in the amount of 5% of the total bid must accompany each proposal.
Key dates
- Pre-bid meeting
- Nov 23, 2026, 11:00 AM Pacific Time
- Bids due
- Jan 5, 2027
More from this agency
Similar bids in Washington
- 2027 CRISI Rural Rail Rehabilitation - PV Hooper Branch - PCC · closes Jan 6, 2027
- Ituha Stabilization Center Addition Construction Project · closes Dec 21, 2026
- Rubber Pads, Part Numbers 3258146-5 and 3258146-2, Sole Sourced to Hutchinson Aerospace · closes Nov 30, 2026
- Interurban Avenue South Overlay Federal Aid Project: Addendum 3 Issued
- Firing Range Target System Replacement · closes Dec 16, 2026
Closing soon in Washington
- Hu-Friedy Dental Kits for Instructional Use, January 2027–December 2027 · closes Nov 25, 2026
- Janitorial Services for NOAA Facility in Wichita, KS · closes Nov 30, 2026
- Request for Qualifications: Port of Friday Harbor Airport Engineering Projects for Three-Year Term with Option to… · closes Nov 30, 2026
- Third-Party Inspectors for CDBG-DR Housing Projects · closes Dec 1, 2026
- Alpine Ridge - Water, Sewer, & Electrical Maintenance & Repair · closes Dec 1, 2026