Lift Station 1 Improvements Project

Cross Valley Water DistrictWashington

Construction of upgrades and rehabilitation at Lift Station 1 (LS-1) wastewater lift station in Woodinville, WA. Scope includes electrical, structural, and mechanical improvements: new generator, ATS replacement, level transducer, float switches, circuit breakers, LED lighting, dry well repairs, handrails, new generator slab and canopy, piping recoating, pump and valve replacements, and temporary sewage bypass. sales tax). Pre-bid tour on December 8, 2026, at 10:00 a.m. PT. Bidders must submit on official form.

On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 10:00 AM Pacific Time
Submission
mail, hand delivery

Scope of work

  • Replace diesel generator with new unit for extended operation
  • Install owner-furnished ATS and replace existing switches
  • Install new submersible level transducer and float switches
  • Replace main circuit breaker, disconnect switch, and lighting with LED
  • Repair dry well concrete joints and install handrails and access
  • Construct new concrete slab and canopy for standby generator

Steps to Bid

  1. 1

    Register on the online plan room to receive automatic email notifications of addenda.

  2. 2

    Attend the pre-bid tour on December 8, 2026, at 10:00 a.m. PT, departing from 8802 180th Street SE, Snohomish, WA 98296. by Dec 8, 2026, 10:00 AM

  3. 3

    Submit a sealed proposal on the official form provided with the Contract Provisions. by Dec 15, 2026, 10:00 AM

What you'll need

Submission

Mail, Hand delivery

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of upgrades and rehabilitation work at the existing wastewater lift station located at 21931 Bostian Road, Woodinville, Washington. The Work includes electrical, structural, and mechanical improvements: replacement of the diesel generator with a new generator sized for extended continuous operation; replacement of the Automatic Transfer Switch (ATS) with an owner-furnished ATS; replacement of the bubbler system for measuring wet well level with a new submersible level transducer; replacement of wet well float switches; replacement of the main circuit breaker and generator disconnect switch; replacement of all interior and exterior lighting with LED fixtures; replacement of the mini power center; replacement of the power meter and service disconnect; removal and replacement of deteriorated interior coatings in the dry well; repair of structural deficiencies and resealing of dry well concrete ring joints; installation of new handrails and stair or ladder access; construction of a new concrete slab and canopy structure for the standby generator; preparation and recoating of exterior surfaces of metallic piping (≥1-inch diameter) within the dry well; replacement of existing pumps; replacement of gate valves and check valves on pump discharge piping; and temporary bypass of sanitary sewage flows. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and incidentals necessary to provide a complete and operable installation in accordance with the Contract Documents. Bidders must submit proposals on the form provided with the Contract Provisions. A pre-bid tour is scheduled for Tuesday, December 8, 2026, departing from the District office at 8802 180th Street SE, Snohomish, WA 98296, at 10:00 a.m. local time. Prospective bidders are encouraged to attend.

Key dates

Pre-bid meeting
Dec 8, 2026, 10:00 AM Pacific Time
Bids due
Dec 15, 2026