Well Site Electrical Systems Upgrade Project
City of PoulsboPoulsbo, Washington#CN2026-11
The City of Poulsbo is soliciting sealed bids for the Well Site Electrical Systems Upgrade Project (Contract No. CN2026-11). Work includes electrical upgrades and VFD installations at four well sites: Lincoln Well #1 (60HP VFD), Lincoln Well #2 (100HP VFD), Big Valley #1 (40HP VFD), Big Valley #2 (60HP VFD), and Westside Well (100HP VFD). Additional work includes generator relocation, pad construction, and integration of instrumentation, controls, and programming using the City’s preferred integrator. All work is within City right-of-way or on City property. Westside Well is the priority site. The project is expected to be completed within 80 working days from Notice to Proceed. The Engineer’s estimate is $400,000–$425,000, inclusive of sales tax. Bidders must submit a bid deposit of at least 5% of their bid amount, including tax, in the form of a certified check, cashier’s check, postal money order, or surety bond payable to the City. The City will not discriminate against disadvantaged business enterprises on the basis of race, color, or national origin. Bid documents are available online at [link available with Pro] or in person at the Public Works Engineering Division office.
On PublicBidSearch: the newspaper notice and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Pacific Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
Scope of work
- Relocate generator to Big Valley site and construct pad
- Perform electrical improvements and controls programming at all four sites
Steps to Bid
- 1
Register on the City of Poulsbo's online plan room at Official linkPro to receive automatic notifications of addenda.
- 2
Download or view the project plans, specifications, and addenda from the online plan room.
- 3
Obtain a physical copy of the documents from the Public Works Engineering Division office at 200 NE Moe Street, Poulsbo, WA 98370, for a non-refundable fee of $30.00, or request mailing for an additional $8.00.
- 4
Prepare and submit a sealed bid with a bid deposit of at least 5% of the bid amount, including sales tax, in the form of a certified or cashier’s check, postal money order, or surety bond payable to the City of Poulsbo. by Dec 2, 2026, 2:00 PM
- 5
Submit the bid in person or by mail to the Public Works Engineering Division, 200 NE Moe Street, WA 98370, by 2:00 PM on December 2, 2026. by Dec 2, 2026, 2:00 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237130
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids will be received at the Public Works Engineering Division, 200 NE Moe Street, WA 98370, until 2:00 PM on December 2, 2026. Bids received after this time will not be considered. Work includes mobilization and demobilization from all four sites, moving a generator from Public Works Admin to the Big Valley site, constructing a generator pad, and connecting the generator. Westside Well is the priority site and will be the first to receive work. The City reserves the right to reject any or all bids or waive any informality. The City will affirmatively ensure that disadvantaged business enterprises are not discriminated against on the basis of race, color, or national origin in the award process. Access to plans, specifications, addenda, and the Bidders List is available through the City of Poulsbo’s online plan room at [link available with Pro]. Bidders may register to receive automatic email notifications of addenda. Physical documents are available for inspection at the Public Works Engineering Division office or for purchase at a non-refundable fee of $30.00, plus $8.00 postage if mailed.
Key dates
- Bids due
- Dec 2, 2026
Similar bids near Poulsbo
- Universal Robots USA Cobot UR20 · Bremerton · closes Nov 30, 2026
- Probe, Eddy Current · Bremerton · closes Nov 19, 2027
- Power Transformers (28 MVA) Mid 638570 — Request for Proposal No. 26-1731-CS · Everett · closes Feb 3, 2027
- EV Electrical Charging Stations Unit Price 2027 · Seattle · closes Dec 3, 2026
- Gorge Powerhouse Crane Replacement · Seattle · closes Nov 30, 2026
Closing soon near Poulsbo
- Procurement of 45-Degree and 90-Degree Elbows, Nipples, Tees, Laterals, Couplings, Bushings, and Related Pipe Fittings… · Bremerton · closes Nov 30, 2026
- CASE HYD AMP 7.250 · Bremerton · closes Dec 1, 2026
- Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract · Silverdale · closes Dec 1, 2026
- Wastewater Planning and Modeling · Shoreline · closes Dec 2, 2026
- 15th Avenue NE Pavement Preservation, NE 160th Street to NE 175th Street · Shoreline · closes Dec 4, 2026