OpenConstructionCloses Dec 3, 2026, 1:15 PM CT

System-wide Water Meter Replacements, Emerging Contaminants (Contract II) – Bayou Pierre Water System, Inc.

Bayou Pierre Water System, INC.Coushatta, Louisiana

Bayou Pierre Water System, Inc. is soliciting sealed bids for system-wide water meter replacements and emerging contaminants mitigation (SCC Project No. 3540). Bids must be submitted by 1:15 P.M. Central Standard Time on December 3, 2026, at 6217 Highway 1, Coushatta, LA 71019, or mailed to P. O. Box 631, Coushatta, LA 71019. Contractors must hold a Louisiana water well drilling license and be registered with Shuler Consulting Company. Bid documents cost $150 and are available at Shuler Consulting’s office. Bidders must submit a signed bid, Bid Bond, Certificate of Corporate Principal and Surety, and a resolution authorizing a representative to sign. All addendums must be acknowledged. No bid may be withdrawn for 45 days after opening. The Contractor must have an active SAM registration prior to construction. The project is subject to BABAA requirements, requiring U.S.-produced materials. Bidders must comply with Executive Order 11246 and all federal and state labor laws.

On PublicBidSearch: the newspaper notice and the agency contact (name and phone) for this bid.

Open Newspaper Notice Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Dec 3, 2026, 1:15 PM CT
Time stated in bid documents
Dec 3, 2026, 1:15 PM Central Time
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Required submission items
6 items · full checklist with Pro

Steps to Bid

  1. 1

    Register with the Engineer, Shuler Consulting Company, (318) 249-3030.

  2. 2

    Obtain bid documents from Shuler Consulting Company for $150.00, or request electronically at no cost.

  3. 3

    Ensure active SAM registration (Official linkPro) prior to construction.

  4. 4

    Prepare and complete the proper bid form, including all required attachments and certifications.

  5. 5

    Submit the sealed bid envelope, marked as specified, by 1:15 P.M. Central Standard Time on December 3, 2026. by Dec 3, 2026, 1:15 PM

What you'll need

Insurance

Required

All applicable laws and regulations of the Federal government and State of Louisiana and bonding and insurance requirements.

Submission

Mail, Hand delivery

NAICS

238290

How to submit

Bids must be submitted in a sealed envelope, plainly marked in the upper left corner: 'SEALED BID, Bid of (Name of Contractor), Bayou Pierre Water System, Inc., System-wide Water Meter Replacements, Emerging Contaminants (Contract II), to be opened at 1:15 P.M. on December 3, 2026, Louisiana Contractor License No. (insert license #).' The envelope must display the Contractor's license number prominently on the outside. All required forms and certifications must be included.

In person/mail: P. O. Box 631, Coushatta, LA 71019

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
  • The 6-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Bids must be submitted on the proper bid form and enclosed in a sealed envelope plainly marked in the upper left corner: 'SEALED BID, Bid of (Name of Contractor), Bayou Pierre Water System, Inc., System-wide Water Meter Replacements, Emerging Contaminants (Contract II), to be opened at 1:15 P.M. on December 3, 2026, Louisiana Contractor License No. (insert license #).' Bidders must be registered with the Engineer, Shuler Consulting Company, (318) 249-3030. Bid documents, including Plans, Specifications, and Forms of Bid Bond, Performance and Payment Bond, are available for inspection at the Owner’s office or for purchase at Shuler Consulting Company’s office for $150.00, refundable under R. S. 38:2212. A resolution authorizing a representative to sign the bid must accompany the submission. All addendums issued must be acknowledged. The Contractor must have an active Unique Entity ID (SAM) verified on [link available with Pro] prior to the start of construction. Mobilization and procurement of materials must begin within 10 working days of the Notice to Proceed. The project is not tax-exempt and is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the IIJA, requiring all iron, steel, manufactured products, and construction materials to be produced in the U.S. unless waived. Bidders must comply with Executive Order 11246, Section 3 Employment Opportunities, and all applicable federal and state laws. Bidders must provide documentation for all required forms and certifications. Special accommodations under ADA must be requested at least 7 days prior to bid opening. Minority Business Enterprises are afforded equal opportunity in award consideration.

Key dates

Bids due
Dec 3, 2026, 1:15 PM CT

More from this agency

Similar open bids

Closing this week nearby