AHU-3 Steam Coil Replacement – Laboratory Sciences Building, University of Wisconsin–Green Bay
University of Wisconsin - Green BayGreen Bay, Wisconsin#26D1A
A non-mandatory pre-bid tour is scheduled for January 5, 2027, at 10:00 AM at the building lobby. Bids must be submitted electronically via the eBuilder Bidding Portal as a PDF with original wet or valid electronic signatures. Alternative submission methods include U.S. The bid opening will be conducted via Microsoft Teams. A bid bond of 5% of the total bid amount is required. Performance and payment bonds of 100% of the contract amount are required. The project is not subject to Wisconsin prevailing wage laws but may be subject to the Federal Davis-Bacon Act. The project manager is Nick Pearce. The architect is Grumman/Butkus Assoc Ltd.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Jan 20, 2027, 6:00 AM CT
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- eBuilder Bidding Portal, U.S. Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
- Contract term
- 120 calendar days from Notice to Proceed
- Documents analyzed
- 2
- Required submission items
- 9 items · full checklist with Pro
Scope of work
- Replace integral face and bypass steam pre-heat coil in AHU-3
- Remove existing coil and install new coil per specifications
- Commissioning of the new coil and system integration
- Comply with DOA-4532 Conditions of the Contract for Simplified Projects
- Submit all required forms and bonds via eBuilder portal
Steps to Bid
- 1
Obtain bidding documents
Bidding documents (drawings, specifications, and addenda) are available as downloadable electronic files (PDF format) from the DFD website. Access is via the bid advertisement portal link.
- 2
Attend pre-bid tour (optional) by Jan 5, 2027, 10:00 AM
A non-mandatory pre-bid tour is scheduled for January 5, 2027, at 10:00 AM at the Lab Sciences Building lobby. Contact William Edwards at 414-476-8980 or [email available with Pro] for details.
- 3
Submit bid via eBuilder portal
Bids must be submitted electronically via the eBuilder Bidding Portal as a PDF file with original wet signatures or properly transmitted electronic signatures. The portal link is available in the bid advertisement.
What you'll need
Submission
EBuilder Bidding Portal, U.S. Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
NAICS
238290
How to submit
Bids must be submitted as a PDF file with original wet signatures or properly transmitted electronic signatures. The eBuilder portal is the preferred method. All submissions must be received by 1:00 PM CDT on January 20, 2027. Third-party delivery is at the bidder's risk. The sealed bid must be delivered to the drop box labeled 'SEALED BIDS ONLY' in front of the Administration Building or to the 7th floor mailroom.
In person/mail: State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 9-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Replacement of the integral face and bypass steam pre-heat coil in air handling unit AHU-3 at the Laboratory Sciences Building, University of Wisconsin–Green Bay. Work includes removal of the existing coil, installation of a new coil per specifications, and commissioning. The project is for a single-phase HVAC system upgrade. The scope is limited to the coil replacement within AHU-3. The work is located in Green Bay, Wisconsin. The project is being procured under the simplified project contract process. The project is not subject to prevailing wage laws under Wisconsin Statute § 16.855(10m)(am)3, effective September 23, 2017. The Federal Davis-Bacon Act may still apply. Bidders may join the teleconference at (608) 571-2209, conference ID: 484 588 360#, starting at 1:45 PM CDT.
Key dates
- Pre-bid meeting
- Jan 5, 2027, 10:00 AM Central Time
- Site visit
- Jan 5, 2027, 10:00 AM Central Time
- Bids due
- Jan 20, 2027, 6:00 AM CT
Documents
- 26D1A_A-1_Document.pdf2 pages
- 26D1A_TOC.pdf2 pages
More from this agency
Similar bids near Green Bay
- Suamico - Well 5 Utility and Backwash Tank · Brown County · closes Dec 10, 2026
- Kaukauna La Follette Park Improvements - Pavilion · Kaukauna · closes Dec 16, 2026
- Combined Locks 2026 Pond Dredging · Combined Locks · closes Dec 1, 2026
- Chilton 2027 Roadway & Utility Improvements · Chilton · closes Dec 10, 2026
- Renovate North Building Elevator – Wisconsin Resource Center · Oshkosh · closes Dec 16, 2026
Closing soon near Green Bay
- Boiler Replacements at Airport · Green Bay · closes Dec 1, 2026
- Leachate Hauling from South Landfill · Green Bay · closes Dec 1, 2026
- Environmental Monitoring Services · Green Bay · closes Dec 1, 2026
- Request for Proposals: Wisconsin Safe Drinking Water Loan Program - Infrastructure Improvements · Green Bay · closes Dec 4, 2026
- Construction of New Water Treatment Facility at 2185 Northwood Road, Village of Suamico, Brown County, WI · Brown County · closes Dec 4, 2026