Air Conditioning Replacement – MCC Room and Administration Building, Pumpkinvine Creek WPCP

Dallas, City OfGeorgia#PE-71050-NONST-2027-000000016

The project includes two parts: Part A (MCC Room, Sludge Pump Building) and Part B (Administration Building). Part A requires two new Trane 10-ton air conditioning units (primary and automatic-failover standby), a dehumidifier, a positive-pressure filtered outside-air system, and associated demolition and building work. Part B requires two new Trane 5-ton rooftop units, adapter curbs, rigging, and crane work. Bidders must attend a mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the plant. Bids must be submitted in duplicate, sealed, and delivered to City Hall by 11:00 AM on January 7, 2027. A 5% bid bond, 100% performance bond, and 100% payment bond are required. The Contractor must propose a schedule for Substantial Completion and must comply with O.C.G.A. § 13-10-91. Liquidated damages of $500 per day apply for delays. The Contractor must provide O&M manuals and training, and warrant workmanship for one year. The City may negotiate with the successful bidder.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 7, 2027
Time stated in bid documents
Jan 7, 2027, 11:00 AM Eastern Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
30 consecutive calendar days from the date of the Notice to Proceed
Documents analyzed
2

Scope of work

  • Install one (1) new dehumidifier with condensate drain
  • Remove and dispose of existing 7.5-ton and wall-mounted units in the MCC Room
  • Furnish and install two (2) new Trane 5-ton rooftop units (offices and laboratory)
  • Remove and dispose of existing rooftop units in the Administration Building

Steps to Bid

  1. 1

    Obtain bid documents from the City of Dallas website (Official linkPro) or via the provided link.

  2. 2

    Attend the mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the Pumpkinvine Creek WPCP, 1753 Old Cartersville Road, Dallas, GA 30132. by Dec 3, 2026, 10:00 AM

  3. 3

    Submit questions to Brandon Rakestraw, Public Works Director, by December 31, 2026. by Dec 31, 2026, 11:00 AM

  4. 4

    Include a bid bond in the amount of 5% of the bid, a 100% performance bond, and a 100% payment bond with the bid submission. by Jan 7, 2027, 11:00 AM

What you'll need

Contract duration

30 consecutive calendar days from the date of the Notice to Proceed

Submission

Mail, Hand delivery

NAICS

238290, 238299, 238999

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The solicitation is divided into Part A (MCC Room, Sludge Pump Building) and Part B (Administration Building), which may be awarded together or separately. The Contractor's engineer is responsible for sizing equipment and preparing sealed drawings meeting the requirements of Exhibit H and Exhibit I. Attendance at a mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the Pumpkinvine Creek WPCP, 1753 Old Cartersville Road, Dallas, GA 30132, is a condition of bid responsiveness. Bids must be submitted in duplicate, sealed, marked with the Bid Number and Company Name, and delivered to the City of Dallas – City Hall, 129 E. Bids received after that time or at any other location will not be considered. The City may award Part A and Part B together, as a single contract, or separately, at its sole discretion. The City requires that all who enter into a contract for the physical performance of services with the City must satisfy O.C.G.A. § 13-10-91 and Rule 300-10-1-.02, in all manner, and such are the conditions of the contract. The Contractor shall furnish all materials, labor, equipment, tools, transportation, supervision, and services necessary for and incidental to the complete and satisfactory performance and construction of the Project, in strict accordance with the Contract Documents. The Contractor shall pay $500.00 per consecutive calendar day as liquidated damages for any delay beyond the Contract Time. Part B's individual rooftop units are additionally subject to the same-day return-to-service requirement. The Contractor shall provide operation and maintenance manuals and short hands-on training for plant staff on all new equipment. The Contractor shall warrant its own workmanship for a period of one (1) year from final completion date.

Key dates

Questions due
Dec 31, 2026, 11:00 AM Eastern Time
Pre-bid meeting
Dec 3, 2026, 10:00 AM Eastern Time
Bids due
Jan 7, 2027

Documents

  • 202611_supportingdocs_PE-71050-NONST-2027-000000016-2026-11-19_15_28_35-b191.pdf1 pages
  • 202611_supportingdocs_PE-71050-NONST-2027-000000016-2026-11-19_15_28_58-5ec2.pdf41 pages

See all documents · Download with Pro

More from this agency

Similar bids in Georgia

Closing soon in Georgia