Air Conditioning Replacement – MCC Room and Administration Building, Pumpkinvine Creek WPCP
Dallas, City OfGeorgia#PE-71050-NONST-2027-000000016
The project includes two parts: Part A (MCC Room, Sludge Pump Building) and Part B (Administration Building). Part A requires two new Trane 10-ton air conditioning units (primary and automatic-failover standby), a dehumidifier, a positive-pressure filtered outside-air system, and associated demolition and building work. Part B requires two new Trane 5-ton rooftop units, adapter curbs, rigging, and crane work. Bidders must attend a mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the plant. Bids must be submitted in duplicate, sealed, and delivered to City Hall by 11:00 AM on January 7, 2027. A 5% bid bond, 100% performance bond, and 100% payment bond are required. The Contractor must propose a schedule for Substantial Completion and must comply with O.C.G.A. § 13-10-91. Liquidated damages of $500 per day apply for delays. The Contractor must provide O&M manuals and training, and warrant workmanship for one year. The City may negotiate with the successful bidder.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 7, 2027
- Time stated in bid documents
- Jan 7, 2027, 11:00 AM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Contract term
- 30 consecutive calendar days from the date of the Notice to Proceed
- Documents analyzed
- 2
Scope of work
- Install one (1) new dehumidifier with condensate drain
- Remove and dispose of existing 7.5-ton and wall-mounted units in the MCC Room
- Furnish and install two (2) new Trane 5-ton rooftop units (offices and laboratory)
- Remove and dispose of existing rooftop units in the Administration Building
Steps to Bid
- 1
Obtain bid documents from the City of Dallas website (Official linkPro) or via the provided link.
- 2
Attend the mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the Pumpkinvine Creek WPCP, 1753 Old Cartersville Road, Dallas, GA 30132. by Dec 3, 2026, 10:00 AM
- 3
Submit questions to Brandon Rakestraw, Public Works Director, by December 31, 2026. by Dec 31, 2026, 11:00 AM
- 4
Include a bid bond in the amount of 5% of the bid, a 100% performance bond, and a 100% payment bond with the bid submission. by Jan 7, 2027, 11:00 AM
What you'll need
Contract duration
30 consecutive calendar days from the date of the Notice to Proceed
Submission
Mail, Hand delivery
NAICS
238290, 238299, 238999
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The solicitation is divided into Part A (MCC Room, Sludge Pump Building) and Part B (Administration Building), which may be awarded together or separately. The Contractor's engineer is responsible for sizing equipment and preparing sealed drawings meeting the requirements of Exhibit H and Exhibit I. Attendance at a mandatory pre-bid site visit on December 3, 2026, at 10:00 AM at the Pumpkinvine Creek WPCP, 1753 Old Cartersville Road, Dallas, GA 30132, is a condition of bid responsiveness. Bids must be submitted in duplicate, sealed, marked with the Bid Number and Company Name, and delivered to the City of Dallas – City Hall, 129 E. Bids received after that time or at any other location will not be considered. The City may award Part A and Part B together, as a single contract, or separately, at its sole discretion. The City requires that all who enter into a contract for the physical performance of services with the City must satisfy O.C.G.A. § 13-10-91 and Rule 300-10-1-.02, in all manner, and such are the conditions of the contract. The Contractor shall furnish all materials, labor, equipment, tools, transportation, supervision, and services necessary for and incidental to the complete and satisfactory performance and construction of the Project, in strict accordance with the Contract Documents. The Contractor shall pay $500.00 per consecutive calendar day as liquidated damages for any delay beyond the Contract Time. Part B's individual rooftop units are additionally subject to the same-day return-to-service requirement. The Contractor shall provide operation and maintenance manuals and short hands-on training for plant staff on all new equipment. The Contractor shall warrant its own workmanship for a period of one (1) year from final completion date.
Key dates
- Questions due
- Dec 31, 2026, 11:00 AM Eastern Time
- Pre-bid meeting
- Dec 3, 2026, 10:00 AM Eastern Time
- Bids due
- Jan 7, 2027
Documents
- 202611_supportingdocs_PE-71050-NONST-2027-000000016-2026-11-19_15_28_35-b191.pdf1 pages
- 202611_supportingdocs_PE-71050-NONST-2027-000000016-2026-11-19_15_28_58-5ec2.pdf41 pages
More from this agency
- Pumpkinvine Creek WWTP – Rare Earth Chloride Coagulant Annual Supply · closes Jan 7, 2027
Similar bids in Georgia
- T32-D6-Vegetation Polk Floyd SR1 SB - 195121 · closes Dec 2, 2026
- Northwest Trail Segment 2C - Construction · closes Dec 8, 2026
- [2009-27] FY27-28 General Contractor (GC) Task Order Contracting Services · closes Dec 4, 2026
- Motor Grader Lease for 1x 2027 CAT 150 or John Deere 770G and 3x 2027 CAT 140 or John Deere 670G with 5-Year Warranty… · closes Dec 3, 2026
- Compton ES Renovation, B27052 · closes Dec 3, 2026
Closing soon in Georgia
- Augusta Regional Airport - Annual Contract: Satellite Hospitality Operations and Planeside Passenger & Flight Crew… · closes Nov 30, 2026
- RFPBaconWAN27, Fiber Optic WAN Service · closes Dec 1, 2026
- Bulloch County Schools - School Nutrition Roof Project · closes Dec 1, 2026
- Alderman Lane and Parking Improvements · closes Dec 2, 2026
- RFP No. 27-0014 Consultant Services for Historic District Design Guidelines · closes Dec 2, 2026