Air Emissions Compliance Source Testing at Tulare Lake Compost
Los Angeles County Sanitation Districts — Financial%20ManagementWhittier, California#04273
The Los Angeles County Sanitation Districts is soliciting proposals for air emissions compliance source testing at the Tulare Lake Compost facility. The work includes testing hybrid extended aerated static piles and an agricultural waste storage pile to measure VOC and ammonia emission rates. Electronic bid documents are available via the provided link. Questions must be submitted per instructions in the bid package.
On PublicBidSearch: the original bid posting and 1 bid document for this bid.
Overview
- Due
- Dec 14, 2026
- Time stated in bid documents
- Dec 14, 2026, 11:00 AM Pacific Time
Scope of work
- Measure mass emission rates of VOCs and ammonia
- Provide test data and report in compliance with facility permits
- Submit results per bid package instructions
Steps to Bid
- 1
Obtain the electronic bid documents from the official link: Official linkPro
- 2
Submit all questions regarding the bid per the instructions listed within the bid package. by Dec 4, 2026, 3:00 PM
- 3
Submit the complete proposal by 11:00 AM on December 14, 2026, in Pacific Time. by Dec 14, 2026, 11:00 AM
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The primary objective is to determine the mass emission rates of volatile organic compounds (VOCs) and ammonia as required by the facility’s permits. Bidders must obtain the electronic bid documents via the link: [link available with Pro]. All questions regarding the bid must be directed per the instructions listed within the bid package.
Key dates
- Questions due
- Dec 4, 2026, 3:00 PM Pacific Time
- Bids due
- Dec 14, 2026
Documents
- www.lacsd.org
More from this agency
- San Jose Creek Trunk Sewer Rehabilitation Phase II · closes Dec 1, 2026
- Joint Outfall A Unit 3C Trunk Sewer Protection Between Manholes A38 and A39 · closes Dec 1, 2026
- Joint Outfall F Unit 3A Trunk Sewer Rehabilitation · closes Dec 8, 2026
- Environmental Analytical Laboratory Services · closes Dec 9, 2026
- Tulare Lake Compost Agricultural Site Wildlife Monitoring · closes Jan 13, 2027
Similar bids near Whittier
- Two (2) 6,250 Gallon High Density Polyethylene (HDPE) Tanks for Metropolitan's Weymouth Water Treatment Plant · Los Angeles · closes Jan 27, 2027
- Material Recovery Processing for Residential & Commercial Recycling · Pasadena · closes Dec 14, 2026
- 8003R1 North Hollywood Central Remediation Well Collector Line · Los Angeles · closes Dec 16, 2026
- Furnish 160 New, Unused Chemical Flow Meters for the Robert A. Skinner Water Treatment Plant · Los Angeles · closes Dec 7, 2026
- Portuguese Bend Landslide Complex Remediation – Vegetation Removal · Rancho Palos Verdes · closes Dec 7, 2026
Closing soon near Whittier
- District Roofing Projects - Summer 2027 · El Monte · closes Dec 1, 2026
- Los Angeles River Bike Trail: Landscape & Irrigation Improvements, Phase 2 · Cudahy · closes Dec 2, 2026
- Roof Replacement - Fire Station 73 · Alhambra · closes Dec 3, 2026
- Ceiling Removal and T-Bar Replacement at Fire Station 71 · Alhambra · closes Dec 3, 2026
- Roofing Replacement at Arroyo Vista Elementary School — Construction Bid No. 26/2701 · South Pasadena · closes Dec 5, 2026