OpenConstructionCloses Dec 3, 2026

ALBANY GSD LAND?LL SOLAR PV PROJECT EPC SERVICES

New York Power Authority — White Plains OfficeAlbany, New York#Q26-7793AF

The contractor will install ballasted racking, inverters, transformers, electrical systems, fencing, and monitoring equipment. Work includes site development, stormwater control, restoration, and coordination with utilities and regulators.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 11:59 PM Eastern Time
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Install 3,075 SunPro SP550W-144M10 solar modules on ballasted racking
  • Construct medium-voltage step-up transformer and interconnection system
  • Install string inverters, AC collection systems, and fencing
  • Implement site stormwater and erosion control measures
  • Complete site restoration and landscaping after construction

Steps to Bid

  1. 1

    Register on NYPA’s Ariba portal

    Firms must register and submit company information via NYPA’s Ariba system at [link available with Pro] to participate in the solicitation.

What you'll need

Submission

Electronic portal

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The EPC contractor shall be responsible for engineering, procurement, construction, commissioning, and start-up of the system. The contractor shall also manage all permits, site development, stormwater control, site restoration, and coordination with local authorities and utility providers. The project must comply with all applicable codes, standards, and environmental regulations, including NYPA’s Renewable Design Standards (RDS), EHS-001 safety requirements, and the results of the geotechnical and wetland delineation studies. The contractor must submit a detailed project schedule, quality program, and O&M manuals.

Key dates

Questions due
Nov 10, 2026, 10:00 AM Eastern Time
Bids due
Dec 3, 2026

Documents

  • Q26-7793AF_-_Attach_A_-Albany_Landfill_Solar_Project_-_Scope_of_Work-IFB_1_.pdf8 pages

See all documents · Download with Pro

More from this agency

Similar bids near Albany

Closing soon near Albany