Alderman Lane and Parking Improvements
Georgia Public Notice — StatewideGeorgia
The City of Springfield, Georgia, is soliciting sealed bids for the construction of Alderman Lane and Parking Improvements. Scope includes 3,170 SY of 6-inch GAB, asphalt milling, 12.5 mm asphalt paving, 300 SY of 6-inch concrete, 1,260 SY of seal coating, 440 LF of header curb, 90 concrete wheel stops, and 70 LF of 8-inch storm pipe. Work also includes demolition, fencing and gate relocation, striping, traffic control, and grading. Bids must be submitted by December 2, 2026, at 2:00 PM at Springfield City Hall, 130 South Laurel Street, Springfield, GA 31329. A bid bond of at least 10% of the base bid is required, issued by a Georgia-licensed surety with an 'A' rating and financial strength five times the contract price. Performance and payment bonds, each equal to 100% of the contract price, are required. Plans and specifications are available for $150 per set from Parker Engineering, LLC.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Eastern Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Required submission items
- 2 items · full checklist with Pro
Steps to Bid
- 1
Obtain plans and specifications from Parker Engineering, LLC, 36 Courtland Street, Suite B, Statesboro, GA 30458, for $150 per full-size set (non-refundable).
- 2
Prepare and submit a sealed bid, including a bid bond or certified cashier's check in an amount not less than 10% of the base bid, to Springfield City Hall at 130 South Laurel Street, Springfield, GA 31329. by Dec 2, 2026, 2:00 PM
- 3
Ensure the bid is received by 2:00 PM on December 2, 2026. Late bids will not be accepted. by Dec 2, 2026, 2:00 PM
What you'll need
Insurance
RequiredPerformance and Payment Bonds, each in an amount equal to 100% of the contract price Published in Effingham Herald.
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Bids must be sealed and submitted in person or by mail to Springfield City Hall. No electronic submissions are permitted.
In person/mail: 130 South Laurel Street, Springfield, Georgia 31329
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Construction of Alderman Lane and Parking Improvements, including approximately 3,170 square yards of 6-inch GAB (Granular Base), asphalt milling, 12.5 mm asphalt paving, 300 square yards of 6-inch concrete, 1,260 square yards of seal coating, 440 linear feet of header curb, 90 concrete wheel stops, and 70 linear feet of 8-inch storm pipe. All work shall be performed in accordance with the plans and specifications. Bids received after the deadline will not be considered. No bid may be withdrawn for 60 days after the bid opening. A bid bond or certified cashier's check in an amount not less than 10% of the base bid is required. The surety must be licensed in Georgia with an 'A' minimum rating for performance and a financial strength of at least five times the contract price as listed in the most current 'Best's Key Rating Guide Property Liability'. Plans, specifications, and contract documents are available for purchase from Parker Engineering, LLC, 36 Courtland Street, Suite B, Statesboro, Georgia 30458, for $150 per full-size set (non-refundable).
Key dates
- Bids due
- Dec 2, 2026
More from this agency
- Fox Senior Center Roofing & Wall Project · closes Dec 9, 2026
Similar bids in Georgia
- Concrete Materials for Douglas County, Georgia Projects · closes Dec 10, 2026
- TELFAIR COUNTY FY 2026 LRA AND FY 2026 LMIG PROJECTS · closes Nov 30, 2026
- Resurfacing of Five City Streets (Gaskin Avenue, Moody Lane, North College Ave, Lockwood Drive, Kennedy Circle) – TIA… · closes Dec 16, 2026
- 2026008-RFP3819 RIVERWOOD PARK · closes Dec 10, 2026
- Gravel Materials for Douglas County, Georgia Projects · closes Dec 10, 2026
Closing soon in Georgia
- Bus Repair Services for Cobb County School District · closes Dec 1, 2026
- Investment Advisory Services · closes Dec 2, 2026
- IFB #503-26 Tires for Dawson County Vehicles and Equipment · closes Dec 3, 2026
- Airport Consulting Services - Engineering · closes Dec 3, 2026
- City of Cartersville Comprehensive Plan 5-Year Update · closes Dec 4, 2026