OpenConstructionCloses Dec 1, 2026

Alignment/Phase IA Study US 56 MP 0 - 8.2

New Mexico DOT — NMDOT Procurement ServicesNew Mexico#27-14

The contract term is intended to be four (4) years, with potential extensions. The selected Offeror will perform Phase IA corridor study services, including records research, identifying existing conditions and deficiencies, public involvement, agency coordination, developing alternatives, and preparing a Scoping Report. Additional phases may be negotiated. Proposals are due by December 1, 2026, at 2:00 PM MST and must be submitted electronically through Bid Express. The Procurement Manager is Paul Gruber ([email available with Pro], 505-469-0374). Offerors must be qualified engineering consultants and comply with NMDOT's Overhead Rate Compliance procedures prior to the proposal deadline. All potential Offerors must return an Acknowledgement of Receipt Form by November 16, 2026, to be placed on the procurement distribution list. Written questions are due by November 18, 2026. The contract award is anticipated in April 2027.

On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 2:00 PM Mountain Time
Submission
electronic portal
Contract term
four (4) year term
Documents analyzed
4 published · 2 analyzed

Scope of work

  • Conduct Phase IA Corridor Study for US 56 MP 0.0 to 8.2.
  • Evaluate and identify deficiencies affecting Level of Service and Safety.
  • Develop a Scoping Report with feasible alternatives and a priority plan.
  • Prepare conceptual engineering plans, costs, and identify scope requirements.

Steps to Bid

  1. 1

    Issue of RFP was Oct 30, 2026

    This date has passed — confirm eligibility with the agency before bidding.

    NMDOT issues the Request for Proposals.

  2. 2

    Deadline to Submit Additional Written Questions was Nov 18, 2026

    This date has passed — confirm eligibility with the agency before bidding.

    Potential Offerors may submit additional written questions to the Procurement Manager.

  3. 3

    Response to Written Questions/RFP Amendments was Nov 20, 2026

    This date has passed — confirm eligibility with the agency before bidding.

    NMDOT will distribute written responses to questions and any RFP amendments.

  4. 4

    Submission of Proposal by Dec 1, 2026, 2:00 PM

    Proposals must be submitted electronically through Bid Express. Offerors must register and create an account with Bid Express prior to the submission deadline. Electronic proposals must be in PDF format.

What you'll need

Contract duration

four (4) year term

Submission

Electronic portal

How to submit

Proposals must be submitted to the Department electronically through Bid Express, which may be accessed at the following website: Official linkPro. Offerors must register prior to the submission deadline and create an account and a digital ID with Bid Express in order to submit proposals electronically. Electronic proposals must be in a PDF format in order to submit through Bid Express. Proposals submitted by hard copy, facsimile, email, or any other manner other than the prescribed means will be rejected. ALL OFFERORS MUST SUBMIT ELECTRONIC COPY THROUGH BID EXPRESS FOR REVIEW AND EVALUATION BY THE PROCUREMENT MANAGER OR DESIGNEE NO LATER THAN 2:00 P.M. MST ON DECEMBER 1, 2026.

In person/mail: New Mexico Department of Transportation Procurement Division PO Box 1149, Room #113 Santa Fe, New Mexico 87504-1149

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The selected Offeror shall perform the services as specified in Appendix A, Project Introduction and Scope of Work. The Department intends on establishing a contract with a four (4) year term. Inquiries must be submitted to the Procurement Manager in writing. The project is located in Colfax County along the US 56 corridor, beginning in Springer at the Interstate 25 Business intersection and ending approximately 8.2 miles east. The roadway is a rural undivided 2-lane section with varying shoulders, except for the beginning 0.5 miles within Springer which has turn lanes, curb and gutter, raised medians, and sidewalk. There are two bridge class structures and approximately 47 culverts within the study limits. The purpose is to conduct a corridor study to evaluate and identify deficiencies affecting Level of Service and Safety, comply with National Highway System requirements, and produce documentation in accordance with NMDOT Location Study Procedures, resulting in a Scoping Report presenting feasible alternatives and a priority plan. The NMDOT intends to negotiate a fixed price for Phase I-A services. Additional phases (I-B, I-C, I-D, II, and III) may be negotiated by amendment or pursued via a new RFP based on available funding. The required services include development and preparation of a Phase I-A Report in accordance with the latest edition of the NMDOT Location Study Procedures Update 2015: A Guidebook for Planning and Environmental Linkages, Alignment Studies, and Corridor Studies. This study shall include records research, identification of existing conditions and deficiencies, preparation and coordination of a Public Involvement Plan, agency/stakeholder/property owner coordination, establishment of purpose and need, development of alternatives, identification and prioritization of safety concerns, screening of alternatives, development of conceptual engineering plans and costs, identification of scope requirements, field exploration, determination of environmental level of effort, development of an Improvement Priority Plan, survey and mapping, environmental documentation and processing plan, environmental/cultural/historic investigations and analysis, agency coordination, incorporation of Context Sensitive Solutions principles, purpose and need statement, access analysis, utility investigation (SUE Level C anticipated), preliminary drainage report, pavement investigations, preliminary ROW analysis, constructability analysis, and a Phase I-A Documentation - Initial Evaluation of Alternatives Report. Location & Topographic Survey, Initial Drainage Report, and Pavement Subgrade Soils Field Exploration and Laboratory Testing are also required. Deliverables include draft and final reports for Initial Drainage and Phase I-A. Phase I-B, I-C, I-D, and II services are by negotiated future amendment and include detailed evaluations, environmental investigations, preliminary design, and final design respectively. Phase III services (engineering services during construction) will be negotiated and added by contract amendment or new RFP, if required.

Key dates

Questions due
Nov 18, 2026
Bids due
Dec 1, 2026

Documents

  • RFP_No_27-14_-_Alignment_Phase_IA_Study_US_56_MP_0_-_8.2_Federal__final.pdf89 pages
  • Summary_of_Questions_and_Answers_RFP_27-14.pdf2 pages
  • Addendum_No_1_RFP_27-14.pdf1 pages
  • Addendum_No_2_RFP_27-14_Revised.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids in New Mexico

Closing soon in New Mexico