OpenIFBCloses Jan 4, 2027

2027 Type III Ambulance Re-Mount

Burke County Board Of CommissionersGeorgia#PE-61700-NONST-2027-000000081

Burke County Board of Commissioners seeks bids for one complete Type III ambulance remount, including a new chassis, refurbishment of the existing modular body, and installation of specified systems. The remount must be delivered F.O.B. Waynesboro, Georgia, with the original chassis returned. Requirements include a new V-8 engine chassis with 14,050 lb GVWR, dual rear wheels, automatic transmission, power features, and upgraded electrical systems. Exterior work includes new running boards meeting NFPA standards, stone guards, skirt rails, rear kick panel, and fenderettes. Interior work requires new Lonplate II vinyl flooring (color 424) with no exceptions allowed. All electrical, lighting, HVAC, oxygen, and vacuum systems must be replaced or upgraded. A pre-construction conference and pre-delivery inspection are required. Bids must be submitted in a sealed envelope marked 'Burke County Type III Remount Bid' to the County Manager at 602 North Liberty Street, Waynesboro, GA 30830, by 12:00 PM on January 4, 2027.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 4, 2027
Time stated in bid documents
Jan 4, 2027, 12:00 PM Eastern Time
Bid bond
10%
Submission
mail, hand delivery
Documents analyzed
1

Scope of work

  • Replacement of all interior components including flooring, cabinets, and windows
  • Compliance with CAAS or NFPA standards for remounts on or after July 1, 2027

Steps to Bid

  1. 1

    Prepare the Bid Proposal, Exceptions and Clarifications form, and Bidder Response Checklist.

  2. 2

    Submit the bid by 12:00 PM on January 4, 2027, via mail or delivery to Burke County Board of Commissioners, c/o County Manager, 602 North Liberty Street, Waynesboro, GA 30830. by Jan 4, 2027, 12:00 PM

  3. 3

    Ensure the bid is in a sealed envelope with 'Burke County Type III Remount Bid' clearly visible on the outside. by Jan 4, 2027, 12:00 PM

  4. 4

    Attend the pre-construction conference if awarded.

What you'll need

Submission

Mail, Hand delivery

NAICS

336313, 485110

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Requirements include: new chassis with V-8 gasoline engine, 14,050 lb GVWR, 158-inch wheelbase, dual rear wheels, automatic overdrive transmission, power windows and locks, power steering, air conditioning, chrome front bumper, OEM stereo, 40-gallon aft-axle fuel tank, and 12-volt 360-amp alternator. Exterior modifications: anti-sail mud flaps, aluminum diamond-treadplate running boards meeting NFPA step requirements, Phoenix stainless-steel wheel inserts, Provision backup camera with 7-inch monitor, modified fuel filler neck, extended tailpipe. Refurbishment of the modular body: complete dismount, inspection for cracks/corrosion using dye penetrant, repair to like-new condition, repainting white over red, installation of new stone guards, skirt/rub rails, rear kick panel, fenderettes, and new exterior door seals. Interior patient compartment: removal of existing floor covering, repair or replacement of subfloor, installation of new heavy-duty commercial-grade Lonplate II vinyl flooring (color 424), extending 4 inches up sidewalls (no exceptions permitted). Replacement of all patient-compartment cabinets, seat-belt mounts, sliding windows, dome lights (LED), and switch panels. Electrical systems: new underhood harness, battery cables, color-coded wiring, 100-watt siren speakers, Whelen 700 LED grille lights, LED lightbar with field-changeable flash pattern, replacement of all exterior lenses and door switches. Heating, cooling, oxygen, and vacuum systems: complete new system interfaced with chassis, performance testing, nitrogen leak test for oxygen system (4-hour duration), vacuum system testing. Pre-construction conference required at Department’s location; pre-delivery inspection trip by Department members to vendor’s location (vendor provides meals and lodging). Compliance with current CAAS Ground Vehicle Standards or NFPA Standard for Automotive Ambulances required for remounts on or after July 1, 2027. All work to be performed in accordance with chassis manufacturer requirements and Georgia ambulance safety rules.

Key dates

Bids due
Jan 4, 2027

Documents

  • 202611_supportingdocs_PE-61700-NONST-2027-000000081-2026-11-11_16_59_58-ecfa.pdf26 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby