Erosion and Sediment Control, Grading, and Site Restoration at Eagle Eye School, Boggs Township, Clearfield County, Pennsylvania

Department of Environmental ProtectionPennsylvania#OSM 17(7088)102.1

The project involves erosion and sediment control, grading, and site restoration at the Eagle Eye School in Boggs Township, Clearfield County, Pennsylvania. Scope includes installation of rock construction entrances, compost filter socks, access roads, clearing and grubbing, trash removal, grading, infiltration trenches, rock energy dissipaters, brush piles, and planting of tree seedlings, grass, and mulch. Work begins on the issue date. Bidders must obtain documents from [link available with Pro]. The Department of Environmental Protection is the owner agency.

On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 10, 2026
Time stated in bid documents
Dec 10, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery

Scope of work

  • Place 5,108 linear feet of 32-inch compost filter sock
  • Place 1,250 linear feet of 12-inch compost filter sock
  • Construct 1 linear segment of access road
  • Clear and grub 36.2 acres
  • Remove 3 tons of trash

Steps to Bid

  1. 1

    Obtain bid documents from Official linkPro

  2. 2

    Review all scope items, quantities, and specifications

  3. 3

    Submit bid by the due date and time by Dec 10, 2026, 2:00 PM

What you'll need

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Implementation of the Erosion and Sediment Pollution Control Plan: Rock construction entrance, 2 each; Compost filter sock, 32 diameter, 5108 linear feet; Compost filter sock, 12 diameter, 1250 linear feet. Grading, 371,891 cubic yards. Hummocky piles, 15 acres. Ripping, 21.2 acres. Infiltration trench: channel excavation, 662 cubic yards; coarse aggregate, 677 tons. Rock energy dissipater, R-5 stone, 26 square yards. Brush piles, 17 each. Planting: preparation, 36.2 acres; tree seedlings, 24,568 each; seed seeding for tree planting areas, 362 pounds; seed seeding for grass planting area, 1,453 pounds; mulching, 24.5 acres. Construction surveying, Type A, 1 linear segment. Free copies of bid documents available at [link available with Pro].

Key dates

Bids due
Dec 10, 2026

More from this agency

Similar open bids

Closing this week nearby