ANF Suppression Damage Chantry
Forest Service — USDA-FS, CSA SOUTHWEST 6California#127EAW27Q0003
Acquisition Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAW27Q0003 is issued as a Request for Quotation (RFQ) for the ANF Suppression Damage Chantry project at Angeles National Forest, California. This project includes rehabilitation of San Olene Road and the Chantry Flats Picnic Area. The applicable North American Industry Classification Standard Code is 237310 - Highway, Street, and Bridge Construction. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. IMPORTANT NOTES: Please refer to the "Quote Submission Requirements" section on page 15 for detailed instructions on submitting your quote, including all required documents and information. All Requests for Information (RFI's) shall be submitted to the Contracting Officer Tanya Torres no later than December 3, 2026, at 11:00 AM Pacific Time, see page 10 for additional information. An organized site visit will not be held. In no event shall failure to inspect the site constitute grounds for a claim after award.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 11:00 AM Pacific Time
- Bid bond
- 20%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- Contract term
- 90 calendar days after Notice to Proceed
- Documents analyzed
- 8 published · 7 analyzed
Scope of work
- Rehabilitate San Olene Road, including pulverizing, compacting, and repaving.
- Slurry seal and restripe Chantry Flats Picnic Area for pavement repair.
- Replace two damaged concrete walkway sections.
- Provide all labor, materials, equipment, and services.
- Complete work within 90 calendar days from Notice to Proceed.
Steps to Bid
What you'll need
Contract duration
90 calendar days from the issuance of the “Notice to Proceed”
Submission
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The contractor shall provide all labor, materials, equipment, and services necessary to complete the work in accordance with the contract requirements and locations designated by the Forest Service. All work must meet industry standards, applicable codes, and licensing requirements. The contract will be a Firm Fixed Price award. The offeror agrees to hold prices firm for 60 calendar days after the receipt of offers. Contractors must have an active entity registration at [link available with Pro] to submit a quote.
Key dates
- Questions due
- Dec 3, 2026, 11:00 AM Pacific Time
- Bids due
- Dec 15, 2026
Documents
- C04_-_1_-_Solicitation_-_127EAW27Q0003_-_ANF_Suppression_Damage_Chantry.pdf18 pages
- C04_-_Attachment_2_-_Statement_of_Work.pdf4 pages
- C04_-_Attachment_3._Schedule_Of_Items.docx
- C04_-_Attachment_4_-_Chantry_Eaton_Damage_Drawings.pdf
- C04_-_Attachment_5_-_Fire_Plan.pdf9 pages
- C04_-_Attachment_6_-_Davis-Bacon_Act_WD_-_CA20260022.pdf26 pages
- C04_-_Attachment_7_-_Contract_Administration_Data.pdf7 pages
- C04_-_Attachment_8_-_RFI_Form.docx
More from this agency
- Procurement of 45 Custom Outdoor-Rated Metal Enclosures for Laurel Electronics Displays — closes Nov 21, 2026
- Solar Batteries Frenchman Work Center — closes Nov 28, 2026
- Camptonville Housing Decommissioning — closes Nov 27, 2026
- Pacific Crest Trail Bridge Replacement — closes Nov 29, 2026
- Airport BAER Weed Treatment — closes Nov 30, 2026
Similar open bids
- Surface Seal Group 2723 — City of San Diego
- Surface Seal Group 2722 — City of San Diego
- Peters Pipeline Control Vault Replacement — Stockton East Water District
- 2026/27 Pavement Maintenance Project — Town of Danville
- Mather Fueling System Repairs — DEPT OF THE ARMY
Closing this week nearby
- 2027 Annual Pavement Rehabilitation Project – Professional Design Services RFP — closes Nov 20, 2026
- RFP – Country Club Drive Pavement Rehabilitation and Active Transportation Design Services — closes Nov 20, 2026
- 2026 Affordable Housing Notice of Funding Availability — closes Nov 20, 2026
- On-Call Armed Security Guard Services for the City of Santa Rosa Police Department — closes Nov 20, 2026
- Construction Manager at Risk for BMR Building at Middlefield Development — closes Nov 20, 2026