Alaska Railroad CorporationAnchorage, Alaska#26-42-316459
The Alaska Railroad Corporation (ARRC) is soliciting bids for concrete crossing panels for a three-year contract with two one-year renewal options, not to exceed five years. Bids must be submitted sealed to the Supply Management Department by 3:00 PM AKST on December 15, 2026. The solicitation includes specifications for panel materials, dimensions, testing, and compliance with Buy America/BABA requirements. All bids must be in U.S. dollars.
On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 16, 2026
- Submission
- mail, hand delivery
- Contract term
- three-year contract + option to extend two additional years on a per year basis. Contract shall not exceed five years.
- Documents analyzed
- 5 published · 1 analyzed
Scope of work
- Provide concrete crossing panels as needed.
- Contract term: three years with option to extend two additional years.
- Manufacturer must be ISO 9000 or AAR M-1003 certified.
- Product warranty for a minimum of ten years against defects.
Steps to Bid
- 1
Submit sealed bids to the Alaska Railroad Corporation Supply Management Department, c/o Sarah Wallace/Bid Number 26-42-316459, 327 West Ship Creek Ave., Anchorage, Alaska 99501.
Bids will be received until 3:00 PM AKST, Thursday, December 15, 2026. At that time, bids will be publicly opened.
- 2
Acknowledge receipt of all issued addenda in your proposal/bid submittal.
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bids must be submitted on the bid forms contained herein and must be mailed or delivered to the Alaska Railroad Corporation Supply Management Department, c/o Sarah Wallace/Bid Number 26-42-316459, 327 West Ship Creek Ave., Anchorage, Alaska 99501. The bid shall be in a sealed envelope with the bid number 26-42-316459 clearly printed on the face of the envelope. Bids must be complete and in U.S. dollars. All testing personnel shall be a minimum of ACI Level I certified. The fabricator shall be responsible for loading and properly securing all precast concrete members for shipment. The manufacturer shall permanently mark each panel with a concrete imprint for size of rail, weight of panel, manufacturer’s ID, month/day/year of manufacture, and crossing type. End of each panel to be stenciled painted with size of rail, weight of panel, and crossing type. Structural steel shall conform to ASTM A36 specifications. Welding to be per AWS code. All exposed steel to receive one coat primer. End angles for each Gauge Panel should have 3” gap minimum to improve shunt resistance. Reinforcing material and cladding to be constructed to meet shunting requirement. A non-conductive spacer to be attached to gauge frame. Cladding on ends of panels should extend beyond concrete 0.125” (+0.125’, -0”) to improve match with adjacent panels. Reinforcing steel shall conform to current ASTM A615 specification, Grade 60. If any welding of reinforcement steel is required, material shall conform to ASTM A706 specification, Grade 60. Concrete compressive strength shall be 4000 PSI per min. prior to release of pretension, and 6500 PSI at 28 days. Maximum water/cement ratio = 0.44 (by weight). Cement to be no more than 0.60% Total Alkali Equivalent. Slump not to exceed 3 inches. Air entrainment = 6 % + or – 1.0% in plastic concrete. Concrete material mixing, placing and curing to be in accordance with PCI “Manual for Quality Control: Precast and Prestressed Concrete.” Manual 115, Edition 4. Top surface shall be non-crack design and is to be sealed to prevent ion migration due to salting. Curling shall follow the recommendations and procedures of PCI in 4th Edition Division 4. 0.1875” Weep/inspection holes shall be placed every 2 feet minimum along the top of the steel frame along a line 0.75” from outside edge. Flangeway filler to be permanently pre-attached and have the following properties: A sample section of the flangeway material shall be physically tested by applying a lateral force of 10 lb/in at 50 degrees Celsius. The maximum lateral displacement of the test is not to exceed 0.25” (crossing type 10C only). Test results must be submitted for railroad approval. Manufacturer to design the pre-attached flangeway filler to allow for removal of panels for maintenance without damaging the flangeway filler or any other components designed to hold it together. 0.25” Rubber interface pad to be placed between panel and ties for 141 lb rail section. Pad to be nailed to ties. Tolerances: Out of square 0.1875” (measured along the diagonal). Length, width, and thickness: +/- 0.125”. The bottom surface, which will be in contact with the ties, shall not undulate in any direction more than 0.09375”. Reinforcement placement shall be +/- 0.75” horizontal, +/- 0.125” vertical. Finish: All recesses and minor concrete spalls are to be filled and finished to the panel dimensions using the proper bonding agent and repair material surface of the repaired area is to match the color and texture of the surrounding areas. The driving surface is to have a light broom finish or as approved by railroads. The addition of water to the concrete surface finish during casting is not permitted. Special Testing: Twice annually, vendors shall submit (via an independent testing laboratory to ARRC) ASTM C666 Freeze/Thaw, ASTM C227 Mortal Bar Method, and ASTM C1260 at total alkali burden = 0.06%. Gauge Panels shall be designed with shunt resistant features in order to provide a minimum electrical resistance in accordance with the standard electrical test (DWG 500930). A representative sample of panels shall be checked periodically for bottom flatness by using a straight edge calibrated to within +/- 0.03125” and a taper gauge. All concrete crossing panels furnished under this solicitation shall comply with FHWA Buy America / Build America, Buy America (BABA) requirements for iron, steel, and manufactured products. Vendors shall provide certification of compliance upon request.
Key dates
- Bids due
- Dec 16, 2026
Documents
- ITB_26-42-316459_ARRC_Concrete_Crossing_Panels_.pdf68 pages
- 0308.pdf2 pages
- 0322.pdf2 pages
- 0330.pdf1 pages
- End_Ramp_1005990-20_Omega_115_.PDF
More from this agency
- Fairbanks Locomotive and Passenger Railcar Toilet Pumping Services · closes Dec 4, 2026
- ARRC Railroad Workers in Charge Term Agreement · closes Dec 11, 2026
- Security Services · closes Dec 16, 2026
- JD Edwards Programming/Development and System Administration (CNC) Support · closes Dec 17, 2026
- Passenger Rail Coach Upholstery Installation · closes Dec 17, 2026
Closing soon near Anchorage
- ACAH Pre Design Work Anchorage Housing Project · Anchorage · closes Dec 2, 2026
- ANC Vertical Infrastructure Earthquake Repairs — South Terminal, North Terminal, and Field Maintenance Building · Anchorage · closes Dec 2, 2026
- Kincaid Elementary School Site Improvements · Anchorage · closes Dec 2, 2026
- Furnish Bulk Medical Supplies (AFD) · Anchorage · closes Dec 3, 2026
- Furnish Soda Ash Feed Pump and Motor Assembly Replacement to the Municipality of Anchorage, Anchorage Water and… · Anchorage · closes Dec 3, 2026