Arrow Canyon Outdoor Interpretive Kiosks: Design, Fabrication, and Installation
Departmental Offices — BLM CONTRACTING ACTIVITYWashington DC#140LL027Q0032
The kiosks must be made of corrosion-resistant metal, include vandal-resistant hardware and plexiglass covers, and be anchored with concrete footings. The Contractor must produce and print panels using permanent outdoor materials, submit designs for Government approval, and complete installation by June 15, 2027. Work must comply with BLM wilderness, cultural resource, wildlife, and safety rules. The Contractor is responsible for all labor, materials, tools, equipment, transportation, excavation, foundations, and site restoration. Deliverables include kiosks, panels, shop drawings, final artwork, installation photos, warranty documentation, and as-built information.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 1, 2026
- Submission
- Contract term
- 12 months
- Documents analyzed
- 3 published · 2 analyzed
- Required submission items
- 5 items · full checklist with Pro
Scope of work
- Furnish and install three (3) double-panel, outdoor-rated metal interpretive kiosks
- Produce and print two (2) 48-inch x 48-inch interpretive panels per kiosk
- Coordinate with BLM on layout and design of panels
- Transport kiosks and panels to staging area
- Install kiosks at three (3) Government-approved locations
Steps to Bid
- 1
Register in Official linkPro and ensure active status.
- 2
Review the full solicitation, including the Statement of Work and incorporated clauses.
- 3
Submit questions in writing to Caitlyn Warner ([email available with Pro]) no later than November 24, 2026, at 1300 PT. by Nov 24, 2026, 1:00 PM
- 4
Attend the optional site visit (if desired) to assess access, terrain, and staging needs.
- 5
Prepare and submit two separate parts: (1) Technical and Past Performance information (no pricing), and (2) Price (via SF 1449).
- 6
Submit all materials electronically via email to [email available with Pro] by the due date.
What you'll need
Contract duration
12/15/2026 to 06/15/2027
Submission
NAICS
541430
How to submit
Submit two separate parts via email to [email available with Pro]: (1) Technical and Past Performance information (no pricing), and (2) Price (via SF 1449).
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 6 watch-outs that disqualify bidders
- The 5-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The kiosks must be constructed of corrosion-resistant metal, feature UV- and weather-resistant finishes, include vandal-resistant hardware and plexiglass covers, and be anchored with concrete footings.
Key dates
- Questions due
- Nov 24, 2026, 1:00 PM Eastern Time
- Bids due
- Dec 1, 2026
Documents
- Sol_140LL027Q0032.pdf14 pages
- B03_SCA_Wage_Determinations_2015-5593_Rev33.pdf10 pages
- A04_Arrow_Canyon_Kiosks_SOW_44057084_Final.pdf7 pages
More from this agency
- Geotechnical Architecture and Engineering Services for OSMRE's Abandoned Mine Land Program — closes Nov 21, 2026
- Integrated Event Management, Production, and Logistical Support for U.S. G7 Host Year 2027 — closes Nov 25, 2026
- Blackwater Cleanup and Restoration at BLM Wild Horse Adoption Office, Burns, Oregon — closes Nov 27, 2026
- Sole Source Contract for Trash Collection Services at Parker Strip Recreation Area — closes Nov 28, 2026
- Request for Information: Contract Writing System Recompete — closes Nov 30, 2026
Similar open bids
- Design-Build Cooling Tower, Roofing, and Structural Construction — BUREAU OF ENGRAVING AND PRINTING
- Vessel Design Challenge: Integrated Fuel Efficiency and Underwater Radiated Noise Reduction Design Demonstration — MARITIME ADMINISTRATION
- Research, Development, Test & Evaluation (RDT&E) Support for the Center for Corrosion Science and Engineering (CCSE) — DEPT OF THE NAVY
- SSN(X) System Arrangement and Whole-Ship Submarine Concept Design Area of Interest — DEPT OF THE NAVY
Closing this week nearby
- Vehicle Lift System - Mobile Column Type (P/N AP1001321) — closes Nov 19, 2026
- Guatemala - K9 Training Equipment and Supplies — closes Nov 19, 2026
- Production of Medicare (Part D Subsidy) Mailing Packages — closes Nov 19, 2026
- Linear Water & Sewer Rehabilitation MSA - Qualifications (Additional Contractors) — closes Nov 20, 2026
- Sole Source DAR Falcon Security Services — closes Nov 20, 2026