Asphalt Mill & Overlay Services at the Union Tower Apartments
Housing Authority, City of Los AngelesLos Angeles, California#232945
Work includes subbase regrading, tack coat application, 3-inch asphalt in parking areas and 4-inch in drive lanes, compaction, re-striping with ADA compliance, and debris removal. Contractors must minimize resident disruption, comply with prevailing wage laws (LOS-2026-2), obtain all city permits, and submit a project schedule, safety plan, and traffic control plan. A one-year warranty is required. The project is expected to be completed in 90 days. A mandatory site visit is scheduled for November 18, 2026, at 1:00 p.m. at the site entrance on Rampart Street.
On PublicBidSearch: the original bid posting, 6 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 5:00 PM Pacific Time
- Bid bond
- 100%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- Contract term
- 90 days from the Notice to Proceed
- Documents analyzed
- 6 published · 1 analyzed
Scope of work
- Mill and remove 17,875 sq ft of existing asphalt pavement
- Regrade and compact subbase
- Provide traffic control and resident access plan
Steps to Bid
- 1
Register as an HACLA vendor at Official linkPro.
- 2
Attend the mandatory site visit on November 18, 2026, at 1:00 p.m. at Union Tower, 2455 South Union Avenue, Los Angeles, CA 90017. Parking is limited and not provided by HACLA. was Nov 18, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Submit written questions to Hadi Otaky by November 20, 2026, at 5:00 p.m. (PT). Questions will be answered via an addendum posted on Official linkPro. was Nov 20, 2026, 5:00 PM
This date has passed — confirm eligibility with the agency before bidding.
What you'll need
Contract duration
90 days from the Notice to Proceed
Submission
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The scope includes removal and disposal of approximately 17,875 square feet of existing asphalt pavement, regrading of the subbase, application of a bonding tack coat, installation of 3-inch asphalt in parking areas and 4-inch asphalt in drive lanes, compaction with a mechanical roller, re-striping of the parking lot including ADA compliance, and removal of all debris. Contractors must coordinate with site management to minimize disruption to residents, maintain OSHA-compliant safety practices, and provide a traffic control and resident access plan. The project is a public works project under California Labor Code sections 1720–1815, requiring prevailing wage compliance. The applicable prevailing wage determination is LOS-2026-2. The contractor must obtain all required City of Los Angeles permits, provide a project schedule, product data sheets for sealcoat and striping materials, a safety plan, and a traffic control and resident access plan. A minimum one-year warranty covering labor and materials is required. The project is expected to be completed within 90 days of the Notice to Proceed. The work will be managed by WSH Management, the Site Agent, and invoices must be submitted to the Site Agent for payment.
Key dates
- Questions due
- Nov 20, 2026, 5:00 PM Pacific Time
- Site visit
- Nov 18, 2026, 1:00 PM Pacific Time
- Bids due
- Dec 2, 2026
Documents
- S-QSP for Union Tower (Asphalt Work).pdf48 pages
- Addendum No. 1 Union Tower Asphalt Work.pdf
- S-QSP for Union Tower (Asphalt Work).pdf48 pages
- S-QSP for Union Tower (Asphalt Work).pdf48 pages
- Addendum No. 2 Union Tower Asphalt Work.pdf3 pages
- Union Towers Parking Lot Diagram.pdf1 pages
More from this agency
- Fraud and Program Non-Compliance Hotline Services · closes Dec 4, 2026
- Elevator Modernization and Maintenance at Wyandotte Apts · closes Dec 17, 2026
- Elevator Modernization and Maintenance at Art Snyder Villas · closes Dec 17, 2026
Similar bids near Los Angeles
- Purchase of 340 Feet of K-Rail, Concrete Barrier, 10 Feet in Length · Los Angeles · closes Dec 10, 2026
- Track Concrete Fastening and Other Track Materials · Los Angeles · closes Dec 1, 2026
- Traffic Monitors for Parking Services Operation, Admission, and Supervision · Los Angeles · closes Dec 2, 2026
- Large Diameter Concrete & Metallic Pipeline Inspection Services · Los Angeles · closes Dec 3, 2026
- 901 Levering Student Housing (BP 08 - 30 - Multiple Trades) PREQUALIFICATION · Los Angeles · closes Dec 10, 2026
Closing soon near Los Angeles
- Water Treatment Services for VHA Sepulveda and Los Angeles Ambulatory Community Centers · Los Angeles · closes Dec 1, 2026
- Cyber Threat Intelligence Sharing Platform · Los Angeles · closes Dec 1, 2026
- Commercial Driver Safety Meetings · Los Angeles · closes Dec 1, 2026
- Atlassian JSM Subscription (Brand Only) · Los Angeles · closes Dec 2, 2026
- Atlassian JSM Subscription · Los Angeles · closes Dec 2, 2026