OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR-80 to Monroe County Line, Baldwin County, AL

Alabama Department of Transportation — ALDOTAlabama#STPAA-HSIP-FMGR-0059(523)

This is a construction solicitation for micro-milling, resurfacing, guardrail installation (including steel blockout replacement), and traffic stripe on SR-59 from CR-80 to Monroe County Line, Baldwin County, AL. The project spans 11.795 miles and includes pavement work, guardrail installation, traffic marking, and site restoration. The contract time is 60 working days. The bracket estimate is $2,468,194 to $3,016,682. Submissions must be sent by mail or hand delivery to the Alabama Department of Transportation, 600 North 20th Street, Montgomery, AL 36104. Bidders may submit questions by the same deadline.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Submission
mail, hand delivery
Documents analyzed
1
Required submission items
1 items · full checklist with Pro

Scope of work

  • Micro-mill 199,319 sq yd of existing pavement
  • Resurface with Superpave bituminous concrete (10,831 tons)
  • Install 182 LF of steel beam guardrail, Class A, Type 2
  • Replace 36 guardrail end anchors (Types 13 and 20 MASH)
  • Apply 24 miles of solid white traffic stripe (5” wide)
  • Apply 15 miles of solid yellow traffic stripe (5” wide)

Steps to Bid

  1. 1

    Register with ALDOT and obtain pre-qualification status.

  2. 2

    Attend the pre-bid meeting (optional but encouraged).

What you'll need

Contract duration

60 working days from notice to proceed

Submission

Mail, Hand delivery

NAICS

237130

How to submit

Submit one original and one electronic copy on a USB drive inside a sealed envelope. The envelope must be marked with the bid number and the date of submission.

In person/mail: 600 North 20th Street, Montgomery, AL 36104

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 1-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Total length: 11.795 miles. Scope includes: removal of existing guardrail (182 linear feet) and end anchors (36 each); machine grading shoulders (23 station); application of tack coat (19,932 gallons); micro-milling of existing pavement (199,319 square yards); use of a material remixing device (1 unit); placement of Superpave bituminous concrete wearing surface layer (10,831 tons, 3/8-inch max aggregate, ESAL Range C/D); widening of wearing surface layer (132 tons); upper binder layer patching (250 tons) and leveling (250 tons), both 1/2-inch max aggregate, ESAL Range C/D; scoring of bituminous pavement (24 miles); mobilization (1 line item); installation of steel beam guardrail, Class A, Type 2 (182 LF); installation of guardrail end anchors, Type 13 (MASH) (16 each) and Type 20 Series (MASH) (20 each); guardrail reset (1,739 LF); topsoil (3,520 cubic yards); seeding (3 acres); mowing (25 acres); solid sodding (Bermuda, 1,054 square yards); mulching (3 acres); pest control treatment (1 acre); silt fence installation (300 LF) and removal (300 LF); construction fuel (maximum bid limited to $137,000); application of solid white, class 2, type A traffic stripe (5” wide, 24 miles); solid yellow, class 2, type A (5” wide, 15 miles); broken yellow, class 2, type A (5” wide, 7 miles); dotted, class 2, type A (5” wide, 220 LF); broken temporary traffic stripe (19 miles); solid temporary traffic stripe (116 miles); broken yellow, class W, type A (5” wide, 1,110 LF); solid yellow, class W, type A (5” wide, 190 LF); solid white with contrast black border, class W, type A (5” wide, 2,220 LF); removal of solid traffic stripe (tape) (2,410 LF); removal of broken traffic stripe (tape) (1,110 LF); traffic control markings (1,307 square feet); traffic control legends (23 square feet); temporary traffic control markings (881 square feet); temporary traffic control legends (23 square feet); pavement markers (Class A-H, Type 2-C: 1,450 each; Type 1-B: 270 each; Type 2-D: 1,145 each); installation of truck-mounted impact attenuator unit (1 unit); construction signs (1,818 square feet); channelizing drums (300 each); pilot car (1 unit); and portable sequential arrow and chevron sign unit (2 units). Questions deadline: December 4, 2026, 4:00 PM local time.

Key dates

Questions due
Dec 4, 2026, 4:00 PM Central Time
Pre-bid meeting
Dec 4, 2026, 4:00 PM Central Time
Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • PITEMS039.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby