OpenRFPCloses Dec 22, 2026

Barney Trask River Weir Staircase

City of HillsboroHillsboro, Oregon#202610-10049

The City of Hillsboro, on behalf of the Barney Reservoir Joint Ownership Commission, is soliciting sealed bids for the construction of a staircase and associated site work at the Barney Trask River Weir. The project includes installing eight micropiles, fabricating and installing a galvanized steel staircase, constructing a concrete landing, installing a modular retaining wall and drainpipe, and implementing erosion and sediment control. Work must be performed in compliance with plans and specifications, with strict protection of existing infrastructure, including a 36-inch water pipeline. The maximum surcharge near the pipeline must not exceed 1,000 psf. A first-tier subcontractor disclosure is due by 4:00 PM on the same day.

On PublicBidSearch: the original bid posting for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 22, 2026
Time stated in bid documents
Dec 22, 2026, 2:00 PM Pacific Time
Submission
mail, hand delivery

Scope of work

  • Install 8 micropiles with drilling, casing, and threaded rod
  • Fabricate and install galvanized steel staircase with treads, stringers, handrails
  • Construct 3 ft x 5 ft concrete landing (~2 cubic yards)
  • Perform grading and backfilling for wall and landing

Steps to Bid

  1. 1

    Register with the City of Hillsboro procurement portal if required.

  2. 2

    Review the full solicitation and all attached documents (if available) to understand scope, specifications, and submission requirements.

  3. 3

    Submit a sealed bid by December 22, 2026, at 2:00 PM local time (PT). by Dec 22, 2026, 2:00 PM

  4. 4

    Submit First Tier Subcontractor Disclosure by December 22, 2026, at 4:00 PM local time (PT). by Dec 22, 2026, 4:00 PM

What you'll need

Submission

Mail, Hand delivery

How to submit

Bids must be submitted in sealed envelopes. All required forms and disclosures must be included. The First Tier Subcontractor Disclosure must be submitted separately and by 4:00 PM on the due date.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Barney Reservoir Joint Ownership Commission (BRJOC) seeks competitive sealed bids from qualified and experienced firms to complete the Barney Trask River Weir Staircase Project. The Contractor shall provide all labor, equipment, and materials necessary to complete the Work in accordance with the plans and specifications. The Work includes installing eight (8) micropiles, including drilling, casing and threaded rod installation, concrete placement, and required testing. It also includes fabricating and installing a galvanized steel staircase, including stair treads, stringers, handrails, connections, hardware, and all other components necessary for a complete installation. Additional work includes installing erosion and sediment control measures, performing grading and backfilling as needed to install a prefabricated modular retaining wall and associated drainpipe, and grading for and constructing a concrete landing approximately 3 feet by 5 feet (approximately 2 cubic yards). All Work shall be completed in accordance with the plans and specifications for the project. The site contains existing infrastructure, including a utility box and cable, an existing staircase, and a 36-inch water pipeline. The Contractor shall protect all existing infrastructure from damage, disturbance, or adverse effects resulting from construction activities. The maximum combined surcharge (equipment and material) within 12 horizontal feet of the existing water pipeline centerline shall be less than 1,000 pounds per square foot (psf). Due to seasonal restrictions associated with protected species and their critical habitat, construction activities are limited to specific times of the year.

Key dates

Bids due
Dec 22, 2026

More from this agency

Similar bids near Hillsboro

Closing soon near Hillsboro