OpenIFBCloses Dec 17, 2026, 2:00 PM CT

BAS System Replacement

Will CountyJoliet, Illinois#2026-85

The project requires replacing existing Alerton and JCI controllers with new BACnet IP or MS/TP controllers, including new cabling and software. Key components to be upgraded include various AHUs, VAVs, and specialized rooms. Bidders must attend a mandatory pre-bid conference on November 20, 2026, at 1:00 P.M. Proposals are due by 2:00 P.M. on December 17, 2026. A 10% bid bond or cashier's check is required.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026, 2:00 PM CT
Time stated in bid documents
Dec 17, 2026, 2:00 PM Central Time
Bid bond
10%
Submission
mail, hand delivery
Documents analyzed
3 published · 2 analyzed

Scope of work

  • Replace all existing building automation system (BAS) controllers with new BACnet IP or MS/TP devices.
  • Install new CAT6 cabling for IP-based controllers and new BACnet MS/TP communication and/or ethernet cabling.
  • Upgrade systems including HWS, CHWS, Domestic Hot Water System, AHUs (with VAVs), MZ-1D, MZ-2D, MZ-1C, and MZ-2C.
  • Install new room sensors with temperature display and CO2 monitoring for group occupancy spaces.
  • Create new graphics for mechanical systems and equipment, and provide/upgrade server software for graphical user interface.
  • Provide 16 hours of support for Test and Balance (TAB) services and 16 hours for Commissioning (Cx) services.

Steps to Bid

  1. 1

    Pre-register for the mandatory pre-bid conference by November 17, 2026, 4:00 P.M. was Nov 17, 2026, 4:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Attend the mandatory pre-bid conference on site. was Nov 20, 2026, 1:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit sealed proposals by the bid deadline. by Dec 17, 2026, 2:00 PM

What you'll need

Bid security

Required

A 10% Bid Bond or Cashier’s Check made payable to the Will County Treasurer MUST accompany your bid, or it will not be considered. Money Orders or Company checks will not be accepted.

Submission

Mail, Hand delivery

How to submit

Sealed proposals must be submitted in triplicate with ONE ORIGINAL, TWO COPIES, AND ONE DIGITAL COPY ON AN ELECTRONIC STORAGE DEVICE, CLEARLY MARKED. Proposals shall be submitted on the forms furnished by the County of Will in a sealed package, plainly marked, with the Bidder's name and address. Bids received after the deadline will not be accepted.

In person/mail: Will County Purchasing Department, Will County Office Building, 302 N. Chicago St., Joliet, IL 60432

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves replacing aging Alerton and Johnson Controls (JCI) devices with new BACnet IP or MS/TP controllers. All old BAS controllers shall be offered to the County for spares or disposed of ethically. CO sensors will be installed in sally ports and parking garages. Graphics for mechanical systems and equipment will be created, and server software will be provided or upgraded to support a graphical user interface. Local access to primary system controllers is required in case of network outage. Sequences of Operations shall adhere to ASHRAE Guideline 36 principles. Negative pressure room conditions will be monitored and displayed. Related documents include Will County Division 25 Integrated Automation and Controls Upgrade Architecture Design.

Key dates

Questions due
Dec 4, 2026, 12:00 PM Central Time
Pre-bid meeting
Nov 20, 2026, 1:00 PM Central Time · Mandatory
Bids due
Dec 17, 2026, 2:00 PM CT

Documents

  • 2026-85_Attachment_1_-_BAS_Object_Naming_Standard.pdf
  • 2026-85_Attachment_2_-_Division_25_Integrated_Automation.pdf85 pages
  • 2026-85_Attachment_3_-_Controls_Upgrade_Architecture_Design.pdf3 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby