Bemis & Sybel Street Construction
City of Moses LakeMoses Lake, Grant, Washington#GC2025-241
Estimated Project Cost: $1,550,000 - $1,750,000 Contract Working Days: 100 This project is to construct both Bemis Street and Sybel Lane to upgrade them from gravel streets to paved streets with curb, gutter, sidewalks, storm drainage, street lighting, and upgraded 8-inch PVC water main and side services. The project also includes paving 175 feet of Milwaukee Avenue to connect existing pavement to Broadway Avenue to reduce gravel road maintenance. The work is scheduled to begin in Spring by April 2027 and includes replacing the old 6-inch AC water main with 1,550 LF of 8-inch PVC, 32 new water service connections, 1,200 tons of CSTC, 2,400 tons of CSBC, 1,200 tons of HMA, 6 catch basins, 2 drywells, 140 LF of 8-inch storm sewer pipe, 3,400 LF of curb and gutter, 2,720 SY of cement concrete, preparation for 6 new PUD street lights (including foundation work, 1,700 LF of 2-inch PVC conduit, and electrical junction boxes), utility casting adjustments, and 3 new 4-inch PVC sewer connections.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Bid bond
- 5%
- Performance bond
- Required
- Payment bond
- Required
- Submission
- mail, hand delivery
- Documents analyzed
- 4 published · 1 analyzed
Steps to Bid
What you'll need
Submission
Mail, Hand delivery
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Documents
- GC2025-241_FinalBidDocs.pdf146 pages
- GC2025-241 Planholders List.pdf2 pages
- Addend-1-CoverLTR.pdf3 pages
- Bid_Summary.pdf8 pages
More from this agency
Closing soon near Moses Lake
- Port of Mattawa Generator Pre-Procurement · Mattawa · closes Nov 30, 2026
- Supply Substation Tapered Tubular Steel Structures - QTEP Monument Hill Switchyard - Rebid · Ephrata · closes Dec 2, 2026
- Supply Substation Tapered Tubular Steel Structures - QTEP Monument Hill Switchyard - Rebid · Ephrata · closes Dec 2, 2026
- Furnishing Steel Structures for QTEP - Wanapum to Mountain View Transmission Line · Ephrata · closes Dec 3, 2026