OpenRFQCloses Nov 30, 2026

BID#: 2026-324

City of Nicholasville — PurchasingNicholasville, Jessamine, Kentucky#2026-324

The CM will be responsible for preconstruction services including bid package preparation, pre-bid conferences, and bid evaluation, and construction phase services including on-site supervision, safety coordination, change order review, and closeout document assembly. Responses must be submitted in six (6) copies, sealed, and delivered to Doug Blackford at 517 North Main Street, Nicholasville, KY 40356, by November 30, 2026, at 3:00 PM EST. The solicitation is governed by Kentucky law and prohibits conflicts of interest and kickbacks.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 30, 2026
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
The contract term will be determined by the Owner and the selected CM after selection, with the project scheduled to begin on December 20, 2026, and substantial
Documents analyzed
2
Required submission items
7 items · full checklist with Pro

Scope of work

  • Construct 9,675 sq ft fire station on Wilmore Road, Nicholasville, KY
  • Include office, decon, dormitory, break, apparatus bay, and storm shelter spaces
  • Install cold-formed framing with masonry and insulated metal panel façades
  • Provide standing seam metal roofing and reinforced masonry 2-bay pull-thru apparatus structure
  • Construct 3-bay utility garage and site improvements including concrete drives and asphalt parking
  • Complete new Wilmore Road access, garbage enclosure, landscaping, and backup generator system

Steps to Bid

  1. 1

    Obtain the official RFQ document by submitting a one-page letter of interest to Doug Blackford at the City of Nicholasville.

What you'll need

Contract duration

From December 20, 2026, to March 1, 2028 (substantial completion), with final completion on April 1, 2028.

Submission

Mail, Hand delivery

NAICS

238210

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 9 watch-outs that disqualify bidders
  • The 7-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

On-site demolition of an existing driveway, residence, and scheduled features is required.

Key dates

Bids due
Nov 30, 2026

Documents

  • RFQ-CM-Services-Fire-Station-5.pdf10 pages
  • RFQ-CM-Services-Fire-Station-5-D21.pdf10 pages

See all documents · Download with Pro