OpenIFBCloses Jan 20, 2027

E-Rate Cabling at Various Schools

ABC Unified School DistrictCerritos, California#1712

1712). The project requires Category 6A U/UTP plenum cable installation, with Belden 10GXS13 or equivalent products accepted. The contract term is from April 1, 2027, to September 30, 2028, with possible extensions. Bidders must hold a California Class C-7 and/or C-10 license. A 10% bid guarantee is required. Performance and payment bonds of 100% of the contract amount are required post-award. Prevailing wages apply. Evaluation criteria include cost, technical compliance, experience, project approach, documentation, and ineligible costs.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Jan 20, 2027
Time stated in bid documents
Jan 20, 2027, 2:00 PM Pacific Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
mail, hand delivery
Contract term
April 1, 2027 through September 30, 2028 + potential for a one-year extension, not to exceed two years
Documents analyzed
1

Scope of work

  • Provide products meeting or exceeding Belden 10GXS13 specifications.
  • Include labeling, testing, and close-out documentation.
  • Account for suspended/drop-tile and hard-lid ceilings in fixed-price proposals.
  • Restore each site to its pre-work condition, including patching and painting.

Steps to Bid

  1. 1

    Review all Contract Documents, including drawings, specifications, and addenda.

  2. 2

    Submit written questions regarding Contract Documents or site conditions. by Dec 21, 2026, 2:00 PM

    Questions must be submitted via email to [email available with Pro], [email available with Pro], and [email available with Pro]. Bidders must confirm receipt.

  3. 3

    Submit bid security (cash, cashier's check, certified check, or bidder's bond) in an amount not less than 10% of the maximum bid amount. by Jan 20, 2027, 2:00 PM

What you'll need

Contract duration

All work completed between April 1, 2027 and September 30, 2028

Award method

The Contract will be awarded to the responsive, responsible bidder with the highest total evaluation score under Item 32 (E-Rate) by action of the governing Board.

Submission

Mail, Hand delivery

How to submit

Bids shall be made and presented only on the forms presented by the District. Bids shall be received in the Office of the Purchasing Department at 16700 Norwalk Blvd. Cerritos, California 90703 and shall be opened and publicly read aloud at the above-stated time and place. Any bids received after the time specified above or after any extensions due to material changes shall be returned unopened. It is each bidder’s sole responsibility to ensure its bid is timely delivered and received at the location designated as specified above. Any bid received at the designated location after the scheduled closing time for receipt of bids shall be returned to the bidder unopened.

In person/mail: Purchasing Department ABC Unified School District 16700 Norwalk Blvd., Cerritos, CA 90703

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

1712, E-Rate Cabling at Various Schools. The contract duration is from April 1, 2027, to September 30, 2028, with potential for a one-year extension, not to exceed two years. Bids will be evaluated based on E-Rate eligible costs (30%), technical compliance and functionality (25%), prior experience, references, and team qualifications (20%), project approach (10%), documentation and close-out (10%), and E-Rate ineligible costs (5%). Bidders must be licensed contractors in California with a Class C-7 and/or C-10 license. Subcontractors must also be licensed. Prevailing wage rates apply. The project is contingent on E-Rate funding. Bidders must comply with E-Rate gift rules and FCC regulations regarding covered companies. Patch cords, demolition or removal of existing cable, new conduit, network equipment, and cabinets are excluded from the scope. No site walkthrough will be conducted.

Key dates

Questions due
Dec 21, 2026, 2:00 PM Pacific Time
Bids due
Jan 20, 2027

Documents

  • Bid_Master_1712_ABCUnified_2027_E_Rate_Cabling.pdf218 pages

See all documents · Download with Pro

More from this agency

Similar bids near Cerritos

Closing soon near Cerritos