Lime Building Roof Replacement at Yellow River Water Reclamation Facility
Gwinnett County GovernmentGeorgia#PE-77023-NONST-2027-000000828
The work includes removal of the existing roof and installation of a new system with insulation, membrane, and flashing. at the facility. Bidders must purchase drawings and specs from Hazen and Sawyer for $50. A 5% bid bond is required. The successful bidder must provide 100% performance and payment bonds. The project must be completed in 90 days for substantial completion and 120 days for final completion. The County may reject any or all bids.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 17, 2026
- Time stated in bid documents
- Dec 17, 2026, 2:50 PM Eastern Time
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- mail, hand delivery
- Documents analyzed
- 2
Scope of work
- Remove existing roof at Lime Building
- Complete work within 90 days for substantial completion
- Complete work within 120 days for final completion
Steps to Bid
- 1
Purchase construction drawings and specifications from Hazen and Sawyer for $50.00 non-refundable.
- 2
Attend the pre-bid conference on November 17, 2026, at 10:00 A.M. at the Yellow River Water Reclamation Facility. was Nov 17, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Include a bid bond or certified check for 5% of the total bid amount. by Dec 17, 2026, 2:50 PM
What you'll need
Contract duration
90 consecutive calendar days for substantial completion; 120 consecutive calendar days for final completion
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Bidders must purchase construction drawings and specifications from Hazen and Sawyer for a non-refundable fee of $50.00. A pre-bid conference is scheduled for November 17, 2026, at 10:00 A.M. at the Yellow River Water Reclamation Facility Conference Room, 858 Tom Smith Road SW, Lilburn, GA 30047. The bid opening will be virtual only. A bid bond of 5% of the total bid amount is required with the submission. Contractors performing utility work must hold a current valid Utility Contractors License.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 17, 2026
Documents
- 202611_supportingdocs_PE-77023-NONST-2027-000000828-2026-11-10_15_19_18-c083.pdf2 pages
- BL137-26_NOT.pdf2 pages
More from this agency
- Purchase and Installation of Aluminum Storefront Assemblies for the Gwinnett County Sheriff’s Office — closes Nov 23, 2026
- Provision of Cleaning and Testing Services for the Firing Range Complex on an Annual Contract — closes Nov 23, 2026
- Provision of Spotlight on SQL Server Enterprise Maintenance and Monitoring Services — closes Nov 24, 2026
- Purchase of an Exhibit Case for the Gwinnett Historic Courthouse — closes Nov 25, 2026
- Trimming of Trees in Medians and Along Right of Ways on an Annual Contract — closes Nov 30, 2026
Similar open bids
- Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF 2027 Expansion — Jackson County Water And Sewerage Authority
- Repair of B-52 CONECT Components — DEPT OF THE AIR FORCE
- Gym/ Classroom Buildout — Baconton Community Charter School
- Request for Proposal - Fiber Internet Service for Charlton County Board of Education - 27CharltonInternet — Charlton County Schools
- AMFF LINE1 CRANE 2 REPLACEMENT — DEPT OF THE AIR FORCE
Closing this week nearby
- Differential Gear U, NSN 2520150266567, Quantity 4 — closes Nov 20, 2026
- Power Supply Procurement - NSN 6120016274887 — closes Nov 20, 2026
- Resurface & Maintenance of SR 216 from SR 45 to SR 37 — closes Nov 20, 2026
- ADDENDUM NO. 1 – EXTENSION OF PROPOSAL DEADLINE — RFP 2026-03: Playground Equipment, Safety Surfacing, Delivery and… — closes Nov 20, 2026
- Playground Equipment, Safety Surfacing, Delivery and Installation — RFP No. 2026-03 — closes Nov 20, 2026