Blackwater School District R 2: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing Equipment
Blackwater School District R 2Blackwater, Missouri#270003126
Blackwater School District R 2, Missouri, is soliciting proposals for managed internal broadband services (MIBS) to support existing network equipment under E-Rate FY2027. The solicitation requires competitive bidding for the management and support of a network including one Fortinet FortiGate 100E firewall, 10 Aruba JX946A wireless access points, six Aruba switches (JL256A, JL357A, JL384A), and two 3COM 3CBLUG24A switches. Bids must be submitted by 2026-11-28, with a minimum 28-day competitive window starting 2026-10-31. All bids must reference Form 470 #270003126 and be emailed to Jill Dare ([email available with Pro]) or Niki Wisniewski ([email available with Pro]). Bids must be fully responsive and follow state and local procurement rules. The district requires the Lowest Corresponding Price (LCP). Equivalent or comparable brands will be considered. Vendors must have a valid SPIN. The district desires flexibility to add or remove services as needs change. The services must be used primarily for educational purposes and not resold.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 28, 2026, 11:59 PM CT
- Time stated in bid documents
- Nov 28, 2026, 11:59 PM Central Time
- Submission
- Documents analyzed
- 3
Scope of work
- Manage and monitor 1 Fortinet FortiGate 100E firewall
- Manage and monitor 6 Aruba switches (JL256A, JL357A, JL384A)
- Manage and monitor 2 3COM 3CBLUG24A switches
- Support and manage all associated network components
Steps to Bid
- 1
Review the FCC Form 470 and the attached RFP and inventory list.
- 2
Submit all proposals and questions by email to Jill Dare at [email available with Pro]. The due date is 2026-11-28. by Nov 28, 2026, 11:59 PM
- 3
Confirm that your bid is fully responsive and includes the Lowest Corresponding Price (LCP) as required by USAC.
- 4
Include your SPIN number and any equivalent or comparable brand offerings in the proposal.
What you'll need
Award method
The bid selected will be for the most cost-effective service or equipment offering, with price being the primary factor, and will be the most cost-effective means of meeting educational needs and tech
Submission
NAICS
517310, 541512
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Non-responsive bids are disqualifying. Vendors must have a valid SPIN and include it in the bid. The RFP is available for review for at least 28 days prior to bid evaluation.
Key dates
- Questions due
- Nov 28, 2026, 11:59 PM Central Time
- Bids due
- Nov 28, 2026, 11:59 PM CT
Documents
- 22854265-USAC_FCC_FORM_470_APPLICATION_270003126_CERTIFIED.pdf5 pages
- 22854162-Blackwater_Make_and_Model.docx.pdf1 pages
- 22854163-MIBS_Networking_Support_RFP_.docx
Similar open bids
- Adrian School District R 3: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing Equipment — Adrian School District R 3
- Adair Co School District R 1: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Adair Co School District R 1
- Adair Co School District R 2: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Adair Co School District R 2
- Clark County School District R1: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Clark County School Dist R 1
- Cooper Co School District R 4: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Cooper Co School District R 4
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026